May 06, 2026 04:03 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Jolt to TMC! Supreme Court rejects plea challenging central staff deployment at Bengal counting centres | Bangladesh MP warns of refugee crisis if BJP wins West Bengal polls | Diplomatic row: Bangladesh summons Indian envoy over Himanta Biswa Sarma remarks | Supreme Court grants Pawan Khera anticipatory bail in case over allegations against Himanta Biswa Sarma's wife | ‘Not necessary to humiliate me with arrest’: Pawan Khera to SC over remarks on Himanta Biswa Sarma’s wife | ‘Let’s not choose for people capable of choosing’: Supreme Court to Centre on teen pregnancy termination | I-PAC co-founder Vinesh Chandel gets bail after Bengal polls conclude | Exit Polls Give Bengal to BJP—But One Survey Begs to Differ | Big defence push: Rajnath Singh to hold high-stakes talks with Italy’s Defence Minister | “Voting without fear”: PM Modi hails record turnout in West Bengal polls

Road over-bridge near Asansol to ease traffic congestion

| | May 23, 2016, at 09:08 pm
Kolkata, May 23 (IBNS) An over-bridge (flyover) over the railway level crossing -- near Kumarpur in Asansol, West Bengal -- on GT Road will be constructed by the Eastern Railways and SAIL-ISP on shared cost basis.
The level crossing is across a stretch of the road that connects Asansol to industrial areas such as Barakar, Sitarampur, Rupnarayanpur, Kulti and Chittaranjan.
 
Manas Sarkar, Chief Engineer (CON-II), Eastern Railways and  Vivek Gupta. GM (Projects), SAIL-ISP signed the Memorandum  of Understanding (MoU) on Saturday on behalf of their respective organisations, in the presence of Babul Supriyo, Union Minister of State for Urban Development, Housing and Urban Poverty Alleviation, who laid the foundation stone of the over-bridge.
 
While the construction of the over-bridge ease the traffic congestion that occurred with the frequent closing of the level crossing gate, it will also allow SAIL-ISP to increase its steel dispatches from its newly-expanded 2.5mtpa capacity steel plant.
 
 
Images: Inauguration of road overbridge foundation stone and MoU signing

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.