December 26, 2025 03:59 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Tarique Rahman returns to Bangladesh after 17 years | Shocking killing inside AMU campus: teacher shot dead during evening walk | Horror on Karnataka highway: sleeper bus bursts into flames after truck crash, 9 killed | PM Modi attends Christmas service at Delhi church, sends message of love and compassion | Delhi erupts over lynching of Hindu man in Bangladesh; protest outside High Commission | Targeted killing sparks global outrage: American lawmakers condemn mob lynching of Hindu man in Bangladesh | Assam on a ‘powder keg’: Himanta Biswa Sarma flags demographic shift, Chicken’s Neck fears | Bangladesh on edge: Student leader shot as pre-poll violence deepens after Hadi killing | Historic deal sealed: India, New Zealand sign landmark Free Trade Agreement in record time | Supreme court snubs urgent plea to stop PMO’s chadar offering at Ajmer Sharif

Second 1000 MWe Unit at Kudankulam goes critical

| | Jul 11, 2016, at 07:47 pm
Chennai, Jul 11 (IBNS) The second nuclear power reactor unit at Kudankulam in Tamil Nadu has gone critical, informed the Department of Atomic Energy on Monday

Prime Minister Narendra Modi on Monday congratulated the Indian and Russian scientists after the second reactor attained criticality on Sunday evening.

"Second reactor at Kudankulam became critical yesterday. This is a piece of great news, which makes us happy," the PM tweeted.

Congratulating the scientists from both the nations, he said, "I congratulate the atomic energy scientists, both from Indian and the Russian side for this major technological success."

This is the second 1,000 MW pressurised water reactor to go critical in the country. The first unit at Kudankulam went critical in July 2013.

The second unit will start commercial generation in four to six months.

Prior to that tests have to be conducted and then the unit will be connected to the Southern power grid.

The approach towards criticality started on Friday with the gradual removal of the control rods.

Once the second unit at Kudankulam starts power generation to its full capacity, the total atomic power capacity in Tamil Nadu would go up to 2,440 MW. 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.