February 28, 2026 03:59 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Panic in Kolkata! Powerful earthquake sends people fleeing buildings | Kejriwal and Sisodia acquitted in liquor policy case; AAP chief calls arrest 'Modi-Shah's conspiracy' | Pakistan bombs Kabul after Afghan forces strike border — tensions on the brink of war! | India crush Zimbabwe by 72 runs to stay alive in T20 World Cup semifinal race | 'CBFC didn't apply mind': Kerala High Court stays Kerala Story 2 release | Operation Sindoor 2.0 will be stronger if India forced to launch: Top Army commander warns Pakistan | ‘Heads must roll!’ Supreme Court cracks down on NCERT textbook over judiciary chapter | ‘1.2 crore voters may be dropped’: Mamata Banerjee flags major concern over SIR list | India-US trade deal at risk? Trump imposes massive 126% duty on solar imports | ‘My life reflects this reality’: Shooter Tara Shahdeo recalls forced conversion amid Kerala Story 2 row
Kashmir Trains
Wikipedia Commons

Jammu and Kashmir: First electric train to start moving on Banihal-Baramulla stretch on Oct 2

| @indiablooms | Sep 19, 2022, at 02:23 am

Jammu and Kashmir is all set to add another golden chapter in its history as the UT is all set to get  its first electric train on October 2.

Oct 2 also marks the birth anniversary of Mahatma Gandhi.

Moreover, trial runs on the 137-kilometer Banihal-Baramulla rail corridor will be conducted later this month.

The electrification work on Baramulla-Budgam sector was completed in May-June this year, while work on the Budgam-Banihal sector will be completed soon, Chief Area Manager Kashmir Northern Railways Saqib Yousuf told Deccan Herald.

The mandatory principal chief electrical engineer (PCEE) inspection of the electric rail link will take place on September 26 and on Gandhi Jayanti, the project will be inaugurated, he said. The project has come up at a cost of Rs 324 crore and the 1 37-kilometer railway track has three main sub-stations - Qazigund, Budgam, and Baramulla - from where power will be supplied to the overhead equipment of the rail line.

The electrification is expected to reduce air pollution trouble as well.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.