September 29, 2026 04:50 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Vijay's TVK makes Bengal entry: First party office opens in Purba Bardhaman amid state's political shake-up | SRFTI clash erupts over ABGP event: Students allege assault; BJP calls it ‘ugly face of Leftists’ | 'Asif bhai gun nikal': 17-year-old's chilling account of men posing as cops raping her in South Delhi park | Indian passport rules changed: New validity, fees for children and adults explained | 'Terrorism by Pakistan will have consequences': India issues blunt warning at UNGA | Trouble for Gyanesh Kumar? Plea filed in Supreme Court seeking prosecution of CEC | Air India pilot suspended after failing alcohol test before Zurich-Delhi flight, weeks after marijuana case | 'Don't be selective, boycott all elections': CJP's Abhijeet Dipke's blunt message to Opposition | 'Resign by tomorrow or face nationwide protest from October 2': CJP's Abhijeet Dipke's fresh warning to Gyanesh Kumar | 'Locked' iPhone 17 at centre of mystery surrounding IIT Bombay student's death
Pakistan Power Shortage

Pakistani cities witnessing massive power outage

| @indiablooms | Jan 23, 2023, at 07:54 pm

Lahore: Key Pakistani cities have been left without power, triggered by  a "frequency variation" in the national grid, on Monday, media reports said.

Power failure has been reported in different cities including Karachi, Lahore, Islamabad, Peshawar and Quetta.

Power Minister Khurrum Dastagir, while talking to Geo News, said that the power generation units are temporarily shut down in winter at night as an economic measure to save fuel costs.

“When the systems were turned on at 7:30am this morning one by one, frequency variation was reported in the southern part of the country between Jamshoro and Dadu. There was a fluctuation in voltage and power generating units were shut down one by one due to cascading impact. This is not a major crisis,” said the federal minister as the country plunged into darkness for the second time in four months.

 The minister said that his ministry has started restoring some grid stations in Tarbela and Warsak.

"Peshawar Electric Supply Company (PESCO) and some grids of Islamabad Electric Supply Company (IESCO) have already been restored," claimed the minister.  

"We provide K-Electric about 1,000-1,100 megawatts routinely, however, it will be restored within a few hours. It is not certain how long will it take to sort this issue. However, my target is to restore electricity in the country in the next 12 hours," said the minister.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.