April 01, 2026 07:24 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bengal SIR progress: 47 lakh of 60 lakh adjudicated cases disposed of, Supreme Court informed | Amit Shah to join Suvendu Adhikari on Bhabanipur nomination day; BJP plans mega roadshow | Fuel prices rise: Premium petrol, diesel hiked amid oil price surge | Commercial LPG up Rs 195.50 as global oil prices rise; domestic rates unchanged | Layoff alert: Oracle cuts 30,000 jobs globally, 12,000 hit in India | ‘Unsubstantial allegations’: Calcutta HC dismisses plea on ECI’s officer transfers in Bengal | Tennis icon Leander Paes joins BJP ahead of Bengal polls | 8 killed, several injured in crowd crush at Bihar temple in Nalanda | Trump signals exit from Iran war even as Strait of Hormuz remains shut: Report | Mystery death in Pakistan: JeM chief Masood Azhar’s brother found dead

N.F. Railway eliminates all un-manned Level-crossing gates in Group – B route between Maldah and New Jalpaiguri

| @indiablooms | Apr 02, 2018, at 11:04 pm

Kolkata, Apr 2 (IBNS): N.F. Railway has achieved the target of elimination of all unmanned level crossing in group ‘B’ route on Mar 31, adhering to the target set by Railway board.

Railway routes are classified into various categories based on the future maximum permissible speed i.e. Group ‘A” with sanctioned speed of 160 km per hour, Group ‘B’ with sanctioned speed of 130 km per hour, Group ‘C’, Group ‘D’, Group ‘E’ etc. N.F. Railway has 230 kms of Group ‘B’ route between Malda Town and New Jalpaiguri in West Bengal, read a government statement.

There are 22 un-manned level crossings in this section, all of which have been eliminated, 21 of them by posting gateman and 1 by diversion.

Presence of un-manned level crossing is a major safety concern, that too in a high speed and high density traffic route.

Elimination of these 22 un-manned crossing has addressed this serious safety concern for the railway.

N.F. Railway, according to P.  Sarmah, the CPRO, has so far eliminated 229 un-manned level crossings during 2017-18.

All un-manned level crossing, in all routes of the railway are to be eliminated by Mar 31, 2019.

 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.