April 03, 2026 10:30 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
AAP drops Raghav Chadha from key parliamentary role, sparks buzz over internal rift | Amit Shah to camp in West Bengal for 15 days during Assembly polls; predicts Mamata’s defeat in state and Bhabanipur | 'BJP plotting President’s Rule, don’t fall in the trap': Mamata Banerjee on Malda unrest, urges peace | 'Most polarised state': CJI Kant raps Bengal govt over 9-hour hostage of judicial officers | Bengal SIR protest: Judge pleads for help amid mob attack after 9-hour hostage ordeal | Bengal SIR progress: 47 lakh of 60 lakh adjudicated cases disposed of, Supreme Court informed | Amit Shah to join Suvendu Adhikari on Bhabanipur nomination day; BJP plans mega roadshow | Fuel prices rise: Premium petrol, diesel hiked amid oil price surge | Commercial LPG up Rs 195.50 as global oil prices rise; domestic rates unchanged | Layoff alert: Oracle cuts 30,000 jobs globally, 12,000 hit in India
Bangladesh
Photo Courtesy: PR Team

Garden Reach Shipbuilders and Engineers to build advanced Ocean-Going Tug for Bangladesh Navy

| @indiablooms | Jul 01, 2024, at 11:20 pm

Keeping up the tempo in the arena of Defence Exports, Garden Reach Shipbuilders and Engineers (GRSE) Ltd signed an agreement with the Directorate General, Defence Purchase, Ministry of Defence, Government of the People’s Republic of Bangladesh on Sunday (June 30, 2024), for the construction of an advanced Ocean-Going Tug.

A few weeks ago, GRSE had signed another contract with Bangladesh for delivery of a Trailing Suction Hopper (TSH) dredger.

More recently, on June 22, 2024, GRSE entered into a contract with a German company for the delivery of at least four multi-purpose cargo vessels.

The overall length (LOA) of the tug will be nearly 61 metres, and the vessel will be about 15.80 metres wide with a depth nearly 6.80 metres.

The tug's draught requirement with a full load will be around 4.80 metres while it's bollard pull capacity will be 76 Tons ahead and 50 Tons astern.

The ship's maximum speed with a full load will be at least 13 knots.

While Cdr Shantanu Bose, IN (Retd), Director (Shipbuilding), GRSE, was present during the signing of the agreement, Cmde A K M Maruf Hassan, Director Purchase (Navy), Directorate General Defence Purchase, Ministry of Defence was present on behalf of the Government of the People's Republic of Bangladesh. Among the others present were the officials from GRSE and Ministry of Defence, Govt of Bangladesh.

The tug's primary roles will include towing of ships at sea, both alongside and astern, assist them during berthing and casting off as well as help them in turning through pushing and pulling.

The vessel will also have the capability to carry out rescue and salvage operations at sea. It's secondary roles will be to provide firefighting support to ships at sea and limited pollution control measures.

The platform will be extremely robust with a capability to operate even at sea state 5 (wind speeds of 17-21 knots and wave heights of 2-3 metres) with dynamic positioning - 2 system capability.

This is an advanced computer-controlled system that allows a ship to maintain its heading and position without the use of mooring lines or anchors.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm