September 30, 2026 06:23 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Israel-bound flight lands in Saudi Arabia as pilots fight in cockpit, stabbing triggers hijack scare mid-air | Vimal ad row: SRK, Ajay Devgn, Tiger Shroff respond to FDA notices, says Tukaram Mundhe | Vijay’s TVK expands to Bengal? Party breaks silence on Purba Bardhaman office | ‘This guy is a monster’: Trump’s hilarious praise for Sundar Pichai, Google CEO’s witty reply | Gyanesh Kumar row exposes INDIA bloc rift: DMK, AAP skip meet, Akhilesh sends representative | SIR row: Supreme Court to hear plea against CEC Gyanesh Kumar next week | Sambhal violence case: SC quashes key accused Mulla Afroz's NSA detention, slaps Rs 10 lakh cost on UP govt | Nandigram bypoll twist: Calcutta HC grants interim bail to Congress candidate Milan Pradhan till Oct 21 | Myanmar military airstrike horror: 49 killed, 58 injured as bombs hit crowded Rakhine market | Britain reopens refugee routes for Afghans, Palestinians as immigration and integration battle intensifies
L&T
Photo: PR Team

L&T Transportation Infrastructure Vertical secures twin contracts in Dubai. All details here

| @indiablooms | Sep 30, 2026, at 05:35 pm

The Transportation Infrastructure business vertical of L&T has formally executed twin contracts – one large* and one significant* – from the Roads and Transport Authority (RTA) of Dubai for the development of the Latifa Bint Hamdan Corridor.

The first contract involves the development of a new road connecting Al Khail Road with the extension of Latifa Bint Hamdan Street, along with the construction of bridges, tunnels and associated road works. This will enhance connectivity between Al Khail Road, Latifa Bint Hamdan Street and Al Meydan Street and improve access to nearby development areas.

The second contract entails the development of parts of Al Meydan Street, including the construction of a new interchange and associated at-grade roads to serve development projects in the area and improve traffic flow. The scope also includes the construction of a cycling track connecting it with the existing cycling network and contributing to an integrated route from Al Qudra to Jumeirah.

Both the projects are scheduled for completion by the end of 2028.Upon completion, the overall Latifa Bint Hamdan Corridor will extend approximately 12 km and strengthen connectivity between Dubai’s key road corridors, including Sheikh Zayed Road, Al Khail Road, Al Meydan Street, Sheikh Mohammed bin Zayed Road, Sheikh Zayed bin Hamdan Al Nahyan Street and Emirates Road.

The corridor is expected to accommodate around 16,000 vehicles per hour in both directions and more than 130,000 trips per day. It will also reduce travel time between Umm Al Sheif Street and Emirates Road from 33 minutes to 15 minutes.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.