August 19, 2026 03:37 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Supreme Court rejects ‘less painful’ death penalty plea, but leaves door open for future change | ‘Vulgarity and disgust’: DMK attacks Vijay over Trisha salute at I-Day event | ‘Take Gyanesh Kumar to the US’: Congress mocks Trump over praise for India’s voter ID system | Big relief for Imran Khan: Pakistan Supreme Court orders hospital transfer amid health fears | Trump praises India’s voter ID system, pushes SAVE America Act | Trump's shock threat to bomb Oman: US President warns ally over Iran deal and Hormuz crisis | Rishabh Pant scripts history! Indian wicketkeeper-batter joins elite 100-sixes club in Test cricket | BJP reshuffles top organisation seven months after Nitin Nabin's elevation | West Bengal STF arrests suspected aide of ISI 'agent' Rana Rauf in Kolkata | ‘Very hopeful’: Indian envoy Dinesh Trivedi breaks silence on PM Tarique Rahman’s proposed India visit
Nitin Gadkari
Image: PIB

Nitin Gadkari inspects Z-Morh Tunnel with Lieutenant Governor of Jammu and Kashmir Manoj Sinha

| @indiablooms | Apr 10, 2023, at 11:11 pm

Union Minister for Road Transport and Highways  Nitin Gadkari in the presence of Lieutenant Governor of Jammu and Kashmir Manoj Sinha and Members of Parliamentary Consultative Committee on Road Transport and Highways inspected the Geo-strategically important Z-Morh Tunnel on Srinagar-Leh Highway (NH-1) on Monday.

19 tunnels are being constructed in Jammu and Kashmir at a cost of Rs 25 thousand crore. Under this, construction work of 6.5 km length Z-morh tunnel and approach road is in progress at a cost of Rs 2680 crore.

This 2-lane road tunnel is being built under the mountain glacier Thajiwas Glacier between Gagangir and Sonamarg in Ganderbal district of Kashmir.

Under the Z-Morh tunnel project, a main tunnel of total length of 10.8 meters with a modified horse shoe shape escape tunnel of total length of 7.5 meters, D-shaped ventilation tunnel of total length of 8.3 meters, 2 major culverts of total length of 110 meters and 270 meters, 1 small culvert of total length of 30 meters is proposed.

Till now 75% work of Z-Morh Tunnel has been completed.

A target has been set to dedicate this tunnel by December 2023.

Intelligent Traffic Management System has been installed in Z-Morh Tunnel which will make it easier to control traffic.

Along with this, traffic will be facilitated through the dedicated escape tunnel.

The Z-Morh tunnel will provide all-weather connectivity to the Sonamarg tourist town.

The debris generated during the construction work of this project has been used for way-side facilities and development of  the area.

The area of Z-Morh tunnel is strategically important as its construction will ensure seamless connectivity between Srinagar and Kargil and there will also be considerable reduction in travel time between Srinagar and Leh.

This tunnel will promote social and economic development in the entire region.

Tourism in Sonamarg will be promoted including activities like whitewater rafting on Thajiwas Glacier and Sindh River.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.