April 26, 2026 02:40 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
YouTuber Saleem Wastik arrested in connection with 1995 kidnapping and murder case | Maharashtra Police makes first arrest months after Akshay Kumar revealed daughter’s cyber harassment | Big political shake-up: KCR’s daughter Kavitha floats new TRS after BRS fallout | ED raids multiple Bengal locations in PDS scam probe amid assembly polls | Bengal polls: Mob attacks central forces, 3 CAPF personnel injured in Birbhum | ‘People voting to protect their rights’: Mamata says high turnout backs TMC in Bengal | ‘Fear is being defeated’: PM Modi says high voter turnout signals BJP win in Bengal | Crude bomb attack in Murshidabad’s Nowda as violence hits Bengal polling | ‘Mamata Banerjee’s politics fuelled BJP growth in Bengal’: Rahul Gandhi | 'Will never forget’: Nation remembers Pahalgam victims as leaders vow strong fight against terror
Pakistan PM
Shehbaz Sharif Instagram page

Pakistan PM Shehbaz Sharif blames Imran Khan govt's 'mismanagement' for ongoing energy crisis

| @indiablooms | Apr 19, 2022, at 12:20 am

Islamabad: Pakistan PM Shehbaz Sharif has blamed ex-PM Imran Khan-led government's 'mismanagement' for the ongoing energy crisis.

Speaking at the National Assembly on Saturday, Sharif said the ongoing loadshedding had nothing to do with the power generation capacity.

“Today there is loadshedding in the country due to gross mismanagement and incompetence of the previous government,” Sharif was quoted as saying by Dawn News.

He said the country had the capacity of generating 35,000 megawatts of electricity, but due to the closure of different power plants running on gas and oil, different parts of the country were facing loadshedding for the last few days.

The prime minister said that soon after assuming the charge, he had received briefings from officials of the ministries of petroleum and energy over the loadshedding issue.

He said the country was facing a shortage of about 6,000 MW of hydel power, which was linked to the melting of glaciers and the availability of water. 
Despite this, he said, the country had sufficient electricity to meet the requirements of the country.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.