May 21, 2026 03:10 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Twisha Sharma death mystery deepens as crucial evidence ‘not shared’ during autopsy: Report | Balcony Smiles, Colosseum Walks and ‘Melodi’ Magic: Modi-Meloni Chemistry Has The Internet Swooning Again | Big relief signal for Umar Khalid, Sharjeel Imam? Supreme Court questions earlier bail denial | Left era ends in Kerala! V.D. Satheesan takes oath as CM after UDF’s massive comeback | Drone strike near UAE nuclear plant sparks panic—India calls it a ‘dangerous escalation' | Kathak to Garba: Indian diaspora stuns PM Modi with grand welcome in Amsterdam | ‘Geography or history’: Indian Army chief issues blunt warning to Pakistan over terror support | India, UAE ink key energy deals during Modi’s visit amid West Asia tensions | ‘There can be no better Bengal CM’: Mithun Chakraborty praises Suvendu Adhikari | PM Modi adviser Sanjeev Sanyal frontrunner for Bengal Finance Minister: Report
Pakistan
Photo Courtesy: Pixabay

Pakistan: NEPRA says Chinese power plants using inferior coal

| @indiablooms | Sep 23, 2023, at 12:49 am

The National Electric Power Regulatory Authority (Nepra), which is the power regulatory body of Pakistan, has exposed Chinese coal-fired power plants to using lower-quality imported coal.

According to reports, the plants had pledged to use coal with a calorific value of 6000 (CVs).

Not a single imported consignment meets the required standards and still they claim multi-billion rupees of capacity payments that are being collected from the public, reports The News International.

This revelation came to light during a public hearing conducted by Nepra on Thursday to review the existing mechanism, last revised in 2016, the newspaper reported.

Nepra Chairman Waseem Mukhtar headed the proceedings while the authority’s members including Mathar Niaz Rana (member Balochistan), Maqsood Anwar Khan (KP), Amina Ahmed (Punjab), and Rafique Ahmad Shaikh (Sindh) were in the presence.

It is important to mention that the coal-based current derated installed capacity is 6,777MW (foreign-funded on imported coal), with an outstanding capacity payment of a substantial Rs643 billion.

While citing documents, a Nepra member was quoted as saying by The News International, “Your documents say that you imported lower quality coal against what was promised in the agreements.”

Notably, the Sahiwal Coal Power Project, now known as Huaneng Shandong Ruyi (Pakistan) Energy (Limited), disclosed that it had imported multi-thousand tons of coal in July 2022 when prices were high, at a rate of Rs70000/ton ($380).

However, in response, the Nepra member said, "You claim capacity payment, but you don’t use costly coal.”

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.