April 15, 2026 07:59 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'ECI deviated from Bihar procedure': Supreme Court raises concerns over voter deletion in Bengal SIR | Noida workers’ protest turns violent: Stones pelted, vehicles damaged over wage hike demand | Oil prices jump above $103 a barrel as US moves to block Iran-linked shipping | I don’t care if they come back or not, says Trump after Iran talks collapse | Legendary singer Asha Bhosle suffers cardiac arrest, hospitalised | Big boost to India–Mauritius ties: S. Jaishankar hands over 90 e-buses | Middle East tension: Iranian delegation arrives in Islamabad for major talks, 10,000 security personnel deployed | Ranveer Singh visits RSS HQ amid Dhurandhar 2 success, triggers speculation | ED raids ex-Bengal minister Partha Chatterjee; SSC scam resurfaces ahead of polls | Amit Shah promises UCC, ₹3,000 aid per month for women and youth in BJP’s Bengal manifesto
Tunnel collapse
Photo courtesy: Uttarkashi Police X page

Rat-hole miners begin manual drilling at Uttarakhand tunnel to rescue 41 trapped workers

| @indiablooms | Nov 28, 2023, at 06:20 am

Manual horizontal drilling has started at the Uttarakhand tunnel where 41 men have been trapped for more than two weeks, reports said.

The process started this evening after the American Augur Drill broke again, its blades fouled up by an iron grill from the tunnel ceiling and other debris.

The work is being conducted by "rat miners"—labourers used to drill narrow shafts as part of a primitive method of coal extraction.

The vertical drilling to create an extra passageway has already progressed to 36 meters, officials said.

Manual drilling from top and side are the two methods on which rescue workers are focussing after several other methods failed. Horizontal drilling from the Barkot end of the tunnel is also in progress.

Neeraj Khairwal, Secretary, Uttarakhand government, said 24 rat miners will work 24 hours to remove manual debris. The work will be done in three shifts.

The Auger Machine, once in working condition, will push the 800-mm pipe forward as the manual drilling progresses.

The officials, however, refused to give a time frame for the rescue.

Manual drilling is a slow and labor-intensive process in which the rat-hole miners will go through the 800 mm pipe, drill manually, and bring out the debris with shovels.

With 10 to 12 meters left to reach the trapped workers and machine drilling options exhausted, manual drilling appears to be the only way forward, the authorities indicated.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.