September 19, 2026 04:49 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Congress' Nandigram candidate arrested after Mamata's support amid TMC symbol row; Bengal bypoll gets chaotic | Gurugram murder shocker: Groom-to-be leaves sisters at Delhi restaurant to meet ex-colleague, found dead days later | Delhi horror: Teen allegedly gangraped, stabbed to death and dumped in field; dogs eat parts of body | TMC name, symbol frozen: EC tells rival factions to pick new identities ahead of Bengal bypolls | Married just 17 days ago: Hyderabad engineer mysteriously found dead at US home | ‘We will promote cash’: New UPI charge triggers trader backlash, Opposition protests | Gurugram biker crash: Main accused Kalyan Bainsla sent to police custody for 2 days | ‘Just tax collection’: Ashneer Grover slams new UPI charges above Rs 2,000 | India condemns Houthi attack on Saudi Arabia, warns of threat to Red Sea shipping | Gurugram biker hit by car: Two including main accused arrested after viral road rage video, attempt to murder case filed
221-km-long canal will carry surplus Ken river water to Betwa river, providing drinking, irrigation facilities. (Image courtesy: Wikimedia Commons)

PM Modi to launch Ken-Betwa river linking project on Vajpayee's birth anniversary

| @indiablooms | Dec 25, 2024, at 12:06 am

Prime Minister Narendra Modi will lay the foundation stone for the Ken-Betwa river linking project in Khajuraho, Madhya Pradesh, on December 25.

The date marks the birth anniversary of former PM Atal Bihari Vajpayee, more than 23 years after the project was first conceptualised.

Madhya Pradesh Chief Minister Mohan Yadav highlighted the transformative potential of the project, stating it would benefit 4.4 million people across 10 districts in Madhya Pradesh and 2.1 million in 12 districts of Uttar Pradesh, reported Hindustan Times.

Together, these regions form the water-scarce Bundelkhand area.

The project will also irrigate nearly one million hectares of farmland and generate 103 MW of hydropower and 27 MW of solar energy once completed in an estimated five years.

“This project will change the image and destiny of Bundelkhand,” Yadav said.


Key Features of the Project

The Ken-Betwa river linking project is the largest irrigation initiative in India, employing an underground pressurised pipe irrigation system. Key components include:

Daudhan Dam: A 77-metre-high, 2.13-kilometre-long structure on the Ken river within the Panna Tiger Reserve.

Tunnels: Two tunnels, 1.9 km and 1.1 km long, to transfer water.

Link Canal: A 221-km-long canal to carry surplus Ken river water to the Betwa river, providing drinking and irrigation facilities.

While the project promises to address water scarcity, it will submerge approximately 40% of the Panna Tiger Reserve and adjoining forest areas.

However, Yadav noted that the Daudhan reservoir would provide year-round drinking water for wildlife in the reserve, enhancing the forest ecosystem.

The project gained momentum after PM Modi assumed office in 2014.

A tripartite Memorandum of Understanding (MoU) was signed on March 22, 2021, between the chief ministers of Madhya Pradesh, Uttar Pradesh, and the Union Jal Shakti Minister in the presence of PM Modi to implement the project.

This monumental initiative is expected to redefine the Bundelkhand region's socio-economic and ecological landscape.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.