April 17, 2026 08:21 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bengal SIR: Supreme Court allows voters restored by tribunal till April 21 and 27 to vote | 'Women won't spare you': PM Modi warns Opposition over resistance to quota bill | Vijay booked in 3 cases over poll code violation ahead of Tamil Nadu polls | 'Black law': Stalin burns copy of 'delimitation' bill, slams Modi govt | TCS halts Nashik BPO operations amid sexual abuse, conversion allegations | ‘We are surprised’: SC stays Pawan Khera’s bail over remarks on Himanta Biswa Sarma’s wife | Historic shift: Bihar gets first BJP CM as Samrat Choudhary takes oath | 'ECI deviated from Bihar procedure': Supreme Court raises concerns over voter deletion in Bengal SIR | Noida workers’ protest turns violent: Stones pelted, vehicles damaged over wage hike demand | Oil prices jump above $103 a barrel as US moves to block Iran-linked shipping
Kolkata Metro
The yellow line is set to commence on August 22. Photo: PR Team

Kolkata metro expansion: Yellow line from Noapara to improve connectivity to city airport

| @indiablooms | Aug 19, 2025, at 12:44 pm

The stretch of Yellow Line Corridor of Metro Railway, Kolkata between Noapara and Jai Hind Bimanbandar (6.77-Km) is now all set to commence metro services.

This stretch of metro section has two other stations enroute viz Dum Dum Cantonment and Jessore Road.

This will reduce the hardship of the residents of this area to reach Kolkata Airport  as after commissioning of this section fast and comfortable metro journey can be enjoyed to Kolkata Airport.

The total cost of this project is approximately Rs 1,866 crores with three newly built stations i.e. Dum Dum Cantonment, Jessore and Jai Hind Bimanbandar.

State of the art passenger amenities will be provided at the newly built stations.

First phase metro will ply on this 6.77-km long stretch having four stations. Jessore Road station is the only station which is being constructed on the surface on this stretch.

Noapara and Dum Dum Cantonment stations have been built on viaducts and Bimanbandar station is an underground station.

People residing at Baranagar, Tobin Road, Sinthee, Dum Dum, Nagerbazar, Kaikhali More areas will find it very convenient to go to any part of the city by using these stations.

Noapara is further connected to the southern part of Kolkata through an interchange point for the journey through the Blue Line from Noapara to Kavi Subhash.

Dum Dum Cantonment is also in the vicinity of Sealdah- Bongaon section of Eastern Railway.

There will be an adequate number of ticket counters, sitting benches, elevators, toilets for ladies, gents and divyangjan, Public Address System for the convenience of the passengers.

The Noapara-Airport stretch along with two other stretches - Sealdah-Esplanade and Ruby More-Beleghata - will be inaugurated by Prime Minister Narendra Modi on August 22.

(Photos: PR Team) 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.