October 07, 2026 11:39 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘Crash axe’ blow fractured Smit Machchhar’s skull: Shocking details emerge from flydubai cockpit horror | ‘Vote thief’ Gyanesh Kumar: Rahul Gandhi climbs barricade, waves Tricolour during explosive INDIA bloc protest | ‘Crash axe’ blow fractured Smit Machchhar’s skull: Shocking details emerge from flydubai cockpit horror | ‘He should not have been flying’: JD Vance on Flydubai co-pilot | Israel was ready to shoot down Flydubai jet if it kept flying towards Tel Aviv: Reports | 'If law wasn't followed, we can undo it': Supreme Court's big warning on SIR process amid Gyanesh Kumar row | From TMC Rajya Sabha MP to BJP nominee in 6 months: Koel Mallick's stunning political U-turn | ‘Stomp on your head’: Omani flydubai co-pilot’s chilling posts on violence against women surface | Asian Games 2026: India beat Pakistan to clinch gold in men's cricket | flydubai cockpit attack: Deleted posts expose Omani co-pilot’s views on women, alleged extremist past
Chenab Bridge
Pixabay (not related to the original story)

Jammu and Kashmir: Locals welcome construction of new bridge over Chenab

| @indiablooms | Jul 10, 2021, at 10:57 pm

Srinagar: The beginning of the construction of  a new concrete bridge over Chenab to replace the old bailey suspension bridge has been appreciated by locals  in Jammu and Kashmir's Ramban, media reports said on Saturday.

For travellers from Gool and Reasi the bridge offers relief. The old bailey suspension bridge, constructed in 1963 by the Central Public Works Department (CPWD), was declared unfit in June 2019, and ever since, it has been repaired several times, reports ANI.

Falling on the old alignment of the Jammu-Srinagar national highway at Maitra in Ramban, the 240ft x 3.75mt bridge connected the major towns of the district, the news agency reported.

Rajinder Singh, a local, told ANI, "The bridge was very old, and we had to take a detour for 13 kilometers if we were travelling via a heavy vehicle, to reach Maitra for work at DC office. Now that the work of a new concrete bridge has begun, vehicles, all big and small, would be able to commute easily. We are happy that the Central government didn't just listen, but also acted on our concerns."

Shabir Ahmed Vaid, the Executive Engineer, Public Works Department (PWD) (Roads and Buildings), said the bridge will be a Canterliver type.

"The under-construction bridge will be 270 meters long and 50 meters high," Vaid told ANI.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.