September 28, 2026 10:08 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'Asif bhai gun nikal': 17-year-old's chilling account of men posing as cops raping her in South Delhi park | Indian passport rules changed: New validity, fees for children and adults explained | 'Terrorism by Pakistan will have consequences': India issues blunt warning at UNGA | Trouble for Gyanesh Kumar? Plea filed in Supreme Court seeking prosecution of CEC | Air India pilot suspended after failing alcohol test before Zurich-Delhi flight, weeks after marijuana case | 'Don't be selective, boycott all elections': CJP's Abhijeet Dipke's blunt message to Opposition | 'Resign by tomorrow or face nationwide protest from October 2': CJP's Abhijeet Dipke's fresh warning to Gyanesh Kumar | 'Locked' iPhone 17 at centre of mystery surrounding IIT Bombay student's death | 'Rahul Gandhi is devoid of wisdom and knowledge': BJP hits back over 'vote theft' claim | ‘How does anti-incumbency disappear?’: Rahul Gandhi targets Modi, Shah in fresh ‘vote chori’ attack, demands Gyanesh Kumar’s resignation
BRO | NH33
Image Credit: Screen grab from video tweeted by @BROindia

BRO opens strategic Leh-Manali Highway in record time of 138 days

| @indiablooms | Mar 26, 2023, at 09:46 pm

New Delhi: The Border Roads Organization (BRO) on Saturday opened the strategically important Leh-Manali Highway (NH 3) in a record time of 138 days, the Ministry of Defence said in a statement.

Leh-Manali Highway is a 427 km long strategic highway connecting Ladakh to the rest of India via Manali, having strategic importance for the movement of the armed forces and their supplies to forward areas in Ladakh, as well as connecting the people of Ladakh to India.

The highway is an alternate route to the 422 km long Srinagar-Kargil-Leh Highway (NH-1D) which was opened by Border Roads Organisation (BRO) in 16 March 2023.

BRO also opened the mighty Shinkula Pass located at 16,580 ft in Nimmu-Padum-Darch road in a record time of 55 days, on 23 March 2023, the ministry said.

The Leh-Manali highway generally remains closed from November end with the onset of winter till it is opened in March.

The entire 427 km road has been cleared of snow by BRO frontline Project Himank in Ladakh and Project Deepak in Himachal Pradesh.

These challenging operations commenced from two extremities of the road by two different teams comprising skilled manpower and state-of-the-art machines, the statement said.

As the two snow clearance teams converge at a common point in Sarchu, Himachal Pradesh, a ‘Golden Handshake’ ceremony was organized there to declare the highway open, it added.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.