December 06, 2025 12:20 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
In front of Putin, PM Modi makes bold statement on Russia-Ukraine war: ‘India is not neutral, we side with peace!’ | Rupee weakens following RBI repo rate cut | RBI slashes repo rate by 25 basis points — big relief coming for borrowers! | 'Mamata fooled Muslims': Humayun Kabir explodes after TMC suspends him over 'Babri Masjid-style mosque' demand; announces new party | Mosque in the middle of Kolkata airport? Centre confirms flight risks, BJP fires at Mamata | Sam Altman is betting big on India! OpenAI in advanced talks with Tata to build AI infrastructure | Government removes mandatory pre-installation of Sanchar Saathi App. Know all details | Calcutta HC overturns controversial Bengal job annulment — 32,000 teachers rejoice! | Bengal SIR shock: 1 lakh ‘deceased voters’ found in Kolkata North! | Massive twist in Bengal voter list: ‘Perfect’ 2,280 booths shrink to just 480 after probe!

Kashmir: Dozens of far-flung, remote areas cutoff due to snowfall

| @indiablooms | Jan 04, 2020, at 04:05 pm

Srinagar/UNI:  Dozens of far-flung and remote villages, including those near the Line of Control (LoC), were again cut off in north Kashmir on Saturday due to fresh light to heavy snowfall.

About 1 to 1.5 feet of snowfall was received since Friday night in the upper reaches in north Kashmir, an official of Police Control Room (PCR), Kupwara, told UNI over phone on Saturday.

''Sadna Top received about 1.5 feet of fresh snowfall since last night while Z-gali recorded 1 foot of fresh snow,'' he said.

He said due to accumulation of over 1 to 1.5 feet of snow, traffic on different routes, leading to far-flung and remote areas, including LoC, have been suspended.

Three main roads of Kupwara-Karnah, Kupwara-Keran and Kupwara-Machil were closed for any vehicular movement due to accumulation of snow. ''The roads are very slippery and it is still snowing in the upper reaches,'' he added.

Razdan pass, connecting Gurez, Neeru and dozens of other areas near LoC with district headquarters Bandipora, was also closed due to snowfall. The road has been closed this morning for any vehicular movement due to several inches of fresh snow and slippery conditions.

The authorities have already pressed into service snow clearance machines and cutters to clear the snow and put through the road, which remained closed for six winter months in the past. But, he said about 80 per cent of the road has been damaged and it is highly unlikely that these areas will be reconnected to district headquarters before March.

The government has already approved a tunnel at Razdan pass to make it an all weather road.

Administration has stocked enough essentials, including rice, atta, sugar, LPG cylinders, medicine at areas which remained cut off during winter with their district and tehsil headquarters in both the district.  
 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.