December 14, 2025 01:50 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Caught in Thailand! Fugitive Goa nightclub owners detained after deadly fire kills 25 | After Putin’s blockbuster Delhi visit, Modi set to host German Chancellor Friedrich Merz in January | Delhi High Court slams govt, orders swift compensation as IndiGo crisis triggers fare shock and nationwide chaos | Amazon drops a massive $35 billion India bet! AI push, 1 million jobs and big plans revealed at Smbhav Summit | IndiGo’s ‘All OK’ claim falls apart! Govt slaps 10% flight cut after weeklong chaos | Centre finally aligns IndiGo flights with airline's operating ability, cuts its winter schedule by 5% | Odisha's Malkangiri in flames: Tribals rampage Bangladeshi settlers village after beheading horror! | Race against time! Indian Navy sends four more warships to Cyclone Ditwah-hit Sri Lanka | $2 billion mega deal! HD Hyundai to build shipyard in Tamil Nadu — a game changer for India | After 8 years of legal drama, Malayalam actor Dileep acquitted in 2017 rape case — what really happened?

GSLV successfully launches GSAT-6A Satellite

| @indiablooms | Mar 30, 2018, at 01:51 am

Sriharikota , Mar 29 (IBNS): India's Geosynchronous Satellite Launch Vehicle (GSLV-F08) successfully launched GSAT-6A Satellite into Geosynchronous Transfer Orbit (GTO) on Thursday.

The launch of GSLV was its twelfth and took place from the Second Launch Pad at Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota, the spaceport of India. This is the fifth consecutive success achieved by GSLV carrying indigenously developed Cryogenic Upper Stage.

In its oval shaped GTO, GSAT-6A is now orbiting the Earth with a perigee (nearest point to Earth) of 169.4 km and an apogee (farthest point to Earth) of 36,692.5 km with an orbital inclination of 20.64 deg with respect to the equator.

Few seconds before the launch countdown reached zero, the four liquid propellant strap-on motors of GSLV-F08, each with nearly 43 tons of liquid propellants, were ignited.

At count zero and after confirming the normal performance of all the four  strap-on motors, the 139 ton solid propellant first stage core motor was ignited and GSLV lifted off at
16:56 IST, as scheduled. The major phases of the flight occurred as intended.  About seventeen and a half minutes after lift-off, GSAT-6A was successfully placed in GTO.
                                     .
Soon after separation from GSLV, the two solar arrays of GSAT-6A were automatically deployed in quick succession and the Master Control Facility (MCF) at Hassan in Karnataka assumed control of the satellite.                                                           .

GSAT-6A is a communication satellite built by ISRO to provide mobile communication services through multi beam coverage.  For this, it is equipped with S and C band transponders.

In the coming days, the orbit of GSAT-6A will be raised from its present GTO to the final circular Geostationary Orbit (GSO) by firing the satellite's Liquid Apogee Motor (LAM) in stages. The Satellite will be commissioned into service after the completion of orbit raising operations and its positioning in the designated slot in GSO following in-orbit testing of its payloads.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.