August 27, 2026 10:05 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Kanpur plane crash: Training aircraft crashes near Ganges, two pilots killed | Big IT boost for Bengal: LTM opens global delivery & AI centre in Kolkata's New Town | 21-year-old Delhi model found stabbed at Delhi home, gym trainer accused of killing her | ‘Who is stopping her from wearing what she wants?’: Kangana Ranaut hits back at Kriti Sanon over Raksha Bandhan ad | 300 Indians missing in Nepal flash floods, 160 dead: Foreign Minister reveals grim toll | Supreme Court directs Tarun Tejpal to surrender within two weeks | Supreme Court notice to 20 rebel TMC MPs in disqualification plea | ‘Reservation for poor, not caste’: Stir at Delhi’s Jantar Mantar | Dalit woman 'gangrape-murder' shocker in Karnataka: 4 arrested after body found in well | India dismisses Pakistan's 'frustration' over US envoy's J&K remark
Tata Power

Tata Power Renewables Commissions 120MW solar project in Mesanka

| @indiablooms | May 04, 2022, at 10:58 pm

Mesanka: Tata Power Renewable Energy Limited (TPREL) 100% subsidiary of Tata Power has commissioned 120MW solar project in Mesanka, Gujarat.

The landmark project will produce 305247 MWh annually for Gujarat Government (GUVNL). In the installation, approximately 3.81 lakhs modules were used and the project will reduce up to 1.03 lakh ton CO2 annually. A thin-film glass on glass modules of various wattages and harnesses of capacity 440Wp to 460Wp have been used in the project.

Speaking on the project commissioning, Dr. Praveer Sinha, CEO&MD, Tata Power said “We are proud to announce the commissioning of the 120 MW solar project at Mesanka, Gujarat within a short span of five months. We have solidified our position as a major renewable energy player with unmatched prowess across the solar EPC value chain and are committed to continuing our steadfast efforts to help India achieve its clean energy goals."

With this addition of 120 MW, the renewables capacity in operation for Tata Power now stands at 3,520 MW with 2,588 MW of Solar and 932 MW of Wind.

"Renewable energy is the future. Every project Tata Power Renewables execute further fortifies our position as one of the leading renewable energy players in the country. Our expert project execution team comes with significant experience in handling unique and demanding projects. Hence, we see each challenge as new learning to push our boundaries. We feel proud to commission the 120MW project at Mesanka, Gujarat as it reasserts our commitment to a sustainable tomorrow.” added Ashish Khanna, President 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.