October 25, 2026 10:40 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Jamia shifts classes online after clash over demand for student union polls; Congress MPs face allegations | Deadly mid-air collision: Four pilots killed as two military aircraft crash in Philippines | ‘Jihad’ calls, Modi assassination remarks: Mumbai Rapido driver arrested over alleged Jaish links | Vegetarian-only kitchen at Keralam Lok Bhavan? Governor's reported order triggers political backlash | ‘Another little Epic Fury’: Trump’s chilling warning to Iran as fresh US strikes loom | Bomb threat email names Amitabh Bachchan’s Jalsa bungalow, Diljit Dosanjh’s concert venue: Reports | ‘Face-offs still continue’: ITBP chief reveals fresh India-China border tensions in Arunachal | Eiffel Tower women staff row: BAPS monk blames ‘miscommunication’, denies delegation's role | ‘Pen, not stones and guns’: RSS-linked group opens its first office in Kashmir Valley under Muslim leader | First human case of Shamonda virus reported in France; WHO confirms death of immunocompromised patient

ONGC Board approves KG basin block field development

| | Mar 28, 2016, at 08:29 pm
New Delhi/Mumbai, Mar 28 (IBNS) The Oil and Natural Gas Corporation Limited (ONGC) has informed that its Board, on Monday, has approved Field Development Plan (FDP) for development of Cluster 2 fields of Deep-water NELP Block KG-DWN-98/2.
KG-DWN-98/2 is part of the Krishna Godavari basin block. 
 
The development cost has been estimated at US$ 5076.37 million (approximately Rs 34,012 crores at USD 1 = INR 67).
 
Cluster 2 of the Block has been divided into two parts: Cluster 2A with an estimated in-place reserve of 94.26 million metric tons (MMt) of crude oil and 21.75 billion cubic metres (BCM) of associated gas and Cluster 2B with an estimated reserve of Free Gas of 51.98 BCM. 
 
ONGC envisages production at a peak oil rate of 77,305 barrel of oil per day (bopd) and 3.81 million metric standard cubic meter per day (MMSCMD) on associated gas through 15 producer wells along with 12 water injection wells with a peak water injection rate of 9400 m3/d from Clutser 2A oilfields.
 
Peak production rate of peak gas is envisaged at 12.75 MMSCMD  from eight wells of Cluster 2B free gas fields.
 
Total oil and gas production from Cluster 2 is estimated as 23.526 MMt and 50.706 BCM, respectively.
 
According to ONGC, the peak daily production rate from Cluster 2 is equivalent to 16.89 per cent and 27.60 per cent of its current production rate of crude oil and natural gas, respectively.
 
The company expects the first gas to be produced by June 209 and first oil by March 2020 with overall completion in June 2020.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.