February 05, 2026 10:00 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘Justice crying behind closed doors’: Mamata Banerjee slams ECI in Supreme Court, CJI Kant assures solution | Mummy, Papa, sorry: Three sisters jump to death after parents object to online gaming | Supreme Court raps Meta, WhatsApp: ‘Theft of private information, won’t allow its use’ | ‘Completely surrendered’: Congress slams Modi after Trump’s trade deal move | PM Modi thanks 'dear friend' Trump for tariff reduction, hails strong US–India partnership | Trump announces US–India trade deal, lowers reciprocal tariffs to 18% | After Budget mayhem, bulls return: Sensex, Nifty stage sharp recovery | Dalai Lama wins first Grammy at 90 | Firing outside Rohit Shetty’s Mumbai home: 4 arrested, Bishnoi Gang link emerges | Female suicide attackers emerge at centre of deadly BLA assaults that rocked Pakistan’s Balochistan
Bangladesh
Photo Courtesy: PR Team

Garden Reach Shipbuilders and Engineers to build advanced Ocean-Going Tug for Bangladesh Navy

| @indiablooms | Jul 01, 2024, at 11:20 pm

Keeping up the tempo in the arena of Defence Exports, Garden Reach Shipbuilders and Engineers (GRSE) Ltd signed an agreement with the Directorate General, Defence Purchase, Ministry of Defence, Government of the People’s Republic of Bangladesh on Sunday (June 30, 2024), for the construction of an advanced Ocean-Going Tug.

A few weeks ago, GRSE had signed another contract with Bangladesh for delivery of a Trailing Suction Hopper (TSH) dredger.

More recently, on June 22, 2024, GRSE entered into a contract with a German company for the delivery of at least four multi-purpose cargo vessels.

The overall length (LOA) of the tug will be nearly 61 metres, and the vessel will be about 15.80 metres wide with a depth nearly 6.80 metres.

The tug's draught requirement with a full load will be around 4.80 metres while it's bollard pull capacity will be 76 Tons ahead and 50 Tons astern.

The ship's maximum speed with a full load will be at least 13 knots.

While Cdr Shantanu Bose, IN (Retd), Director (Shipbuilding), GRSE, was present during the signing of the agreement, Cmde A K M Maruf Hassan, Director Purchase (Navy), Directorate General Defence Purchase, Ministry of Defence was present on behalf of the Government of the People's Republic of Bangladesh. Among the others present were the officials from GRSE and Ministry of Defence, Govt of Bangladesh.

The tug's primary roles will include towing of ships at sea, both alongside and astern, assist them during berthing and casting off as well as help them in turning through pushing and pulling.

The vessel will also have the capability to carry out rescue and salvage operations at sea. It's secondary roles will be to provide firefighting support to ships at sea and limited pollution control measures.

The platform will be extremely robust with a capability to operate even at sea state 5 (wind speeds of 17-21 knots and wave heights of 2-3 metres) with dynamic positioning - 2 system capability.

This is an advanced computer-controlled system that allows a ship to maintain its heading and position without the use of mooring lines or anchors.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm