October 23, 2026 08:29 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Tiger Shroff, not Salman Khan, was the main target, probe reveals shocking details | Dammam airport attack: Indian killed, two compatriots injured as Saudi Arabia faces fresh strikes | ‘Among others’: Macron takes swipe at Trump over France unrest, calls foreign leaders’ remarks ‘stupid’ | ‘Specific threat-related inputs’: Delhi Police blocks Diljit Dosanjh’s Delhi concert | ‘Barbaad kare alfaz mere’: Ranbir Kapoor apologises for Dussehra gaffe in Kolkata | Delhi court releases CJP's Saurav Das and Ashutosh Ranka after 7 days in custody | ‘We are seeing what is happening outside our country’: Delhi HC judge’s remark as CJP leaders Saurav Das and Ashutosh Ranka withdraw custody plea | Salman Khan was the original target? Tiger Shroff firing probe reveals shocking twist | ‘UN experts are an oxymoron’: Marco Rubio takes swipe at UN, refuses to comment on India's protests | ‘US ties with no country come at India's expense’: Marco Rubio addresses concerns over Pakistan, China
Bangladesh
Photo Courtesy: PR Team

Garden Reach Shipbuilders and Engineers to build advanced Ocean-Going Tug for Bangladesh Navy

| @indiablooms | Jul 01, 2024, at 11:20 pm

Keeping up the tempo in the arena of Defence Exports, Garden Reach Shipbuilders and Engineers (GRSE) Ltd signed an agreement with the Directorate General, Defence Purchase, Ministry of Defence, Government of the People’s Republic of Bangladesh on Sunday (June 30, 2024), for the construction of an advanced Ocean-Going Tug.

A few weeks ago, GRSE had signed another contract with Bangladesh for delivery of a Trailing Suction Hopper (TSH) dredger.

More recently, on June 22, 2024, GRSE entered into a contract with a German company for the delivery of at least four multi-purpose cargo vessels.

The overall length (LOA) of the tug will be nearly 61 metres, and the vessel will be about 15.80 metres wide with a depth nearly 6.80 metres.

The tug's draught requirement with a full load will be around 4.80 metres while it's bollard pull capacity will be 76 Tons ahead and 50 Tons astern.

The ship's maximum speed with a full load will be at least 13 knots.

While Cdr Shantanu Bose, IN (Retd), Director (Shipbuilding), GRSE, was present during the signing of the agreement, Cmde A K M Maruf Hassan, Director Purchase (Navy), Directorate General Defence Purchase, Ministry of Defence was present on behalf of the Government of the People's Republic of Bangladesh. Among the others present were the officials from GRSE and Ministry of Defence, Govt of Bangladesh.

The tug's primary roles will include towing of ships at sea, both alongside and astern, assist them during berthing and casting off as well as help them in turning through pushing and pulling.

The vessel will also have the capability to carry out rescue and salvage operations at sea. It's secondary roles will be to provide firefighting support to ships at sea and limited pollution control measures.

The platform will be extremely robust with a capability to operate even at sea state 5 (wind speeds of 17-21 knots and wave heights of 2-3 metres) with dynamic positioning - 2 system capability.

This is an advanced computer-controlled system that allows a ship to maintain its heading and position without the use of mooring lines or anchors.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.