October 23, 2026 12:59 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Tiger Shroff, not Salman Khan, was the main target, probe reveals shocking details | Dammam airport attack: Indian killed, two compatriots injured as Saudi Arabia faces fresh strikes | ‘Among others’: Macron takes swipe at Trump over France unrest, calls foreign leaders’ remarks ‘stupid’ | ‘Specific threat-related inputs’: Delhi Police blocks Diljit Dosanjh’s Delhi concert | ‘Barbaad kare alfaz mere’: Ranbir Kapoor apologises for Dussehra gaffe in Kolkata | Delhi court releases CJP's Saurav Das and Ashutosh Ranka after 7 days in custody | ‘We are seeing what is happening outside our country’: Delhi HC judge’s remark as CJP leaders Saurav Das and Ashutosh Ranka withdraw custody plea | Salman Khan was the original target? Tiger Shroff firing probe reveals shocking twist | ‘UN experts are an oxymoron’: Marco Rubio takes swipe at UN, refuses to comment on India's protests | ‘US ties with no country come at India's expense’: Marco Rubio addresses concerns over Pakistan, China

Essar Steel bags major order from Gujarat govt

| | Jun 17, 2014, at 04:01 am
Mumbai, June 16 (IBNS): Essar Steel on Monday announced that it has bagged an order for the supply of pipes for one of the most prestigious projects of the Gujarat Government for water management, Saurashtra Narmada Avtaran Irrigation (SAUNI) Yojana.
Under this programme, the water of Narmada will be distributed to 115 reservoirs across seven districts of Saurashtra through four link pipelines benefitting 10,22,589 acres.
 
This project is estimated to cost Rs. 10,800 crore.
 
Of the 5.86 lakh tonnes of pipes required for the project, Essar Steel will supply 1.2 lakh tonnes of HSAW (Helical Submerged Arc Welding) pipes, which are 12-m long and 120 inches in diameter.
 
The order will be executed over a period of one year. Essar Steel has an annual production capacity of 2.75 lakh tonnes of HSAW pipes.
 
Commenting on the recent order, Harjit S. Bedi, CEO, Essar Pipe Mill said, “We are very happy to be associated with the SAUNI project of the Gujarat Government. It is clearly a reflection of Essar Steel’s integrated capability to produce world-class pipes in India. We have an excellent track record in supplying water pipes to many projects in India.”
 
Essar Steel’s pipe mill has an annual production capacity of 0.6 million tonnes of which 3.25 lakh tonne is LSAW pipes and 2.75 lakh tonne is HSAW pipes. The plant is backed by a steel plant ensuring quality steel for making pipes.
 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.