December 25, 2025 07:22 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Tarique Rahman returns to Bangladesh after 17 years | Shocking killing inside AMU campus: teacher shot dead during evening walk | Horror on Karnataka highway: sleeper bus bursts into flames after truck crash, 9 killed | PM Modi attends Christmas service at Delhi church, sends message of love and compassion | Delhi erupts over lynching of Hindu man in Bangladesh; protest outside High Commission | Targeted killing sparks global outrage: American lawmakers condemn mob lynching of Hindu man in Bangladesh | Assam on a ‘powder keg’: Himanta Biswa Sarma flags demographic shift, Chicken’s Neck fears | Bangladesh on edge: Student leader shot as pre-poll violence deepens after Hadi killing | Historic deal sealed: India, New Zealand sign landmark Free Trade Agreement in record time | Supreme court snubs urgent plea to stop PMO’s chadar offering at Ajmer Sharif

GRSE readies double-lane portable stell bridge in record time

| @indiablooms | Sep 17, 2019, at 07:12 pm

Kolkata: The Research and Development team of city-based Garden Reach Shipbuilders & Engineers Limited(GRSE) has turned the construction of a bailey type double-lane portable steel bridge into a reality,  in record time. 

GRSE Design Team’s R&D has worked successfully in developing ways to ease heavy traffic congestions and establish links between roads/ highways through playing a vital role in strategic surface transport networks.

 

It started with the immediate market requirement of a two-lane quick-launch bridge to supplement the existing single-lane bailey bridge.

 

Taking up the challenge, the Engineering Design team at GRSE embarked on the process of design, fabrication and erection of the bridge on a war footing.

 

The construction of the bridge was carried out inside the Company’s premises near Belur station, in Kolkata. Scientists from the Structural Engineering Research Centre (SERC), CSIR have validated the bridge through live load tested for double Class-A vehicle loading as per latest Indian standard, viz., Indian Road Congress (IRC-6).

 

Construction of Launching Abutment for the bridge was completed and the bridge, the first of its kind in India, was launched on 30 Aug 2019.

 

The pre-fabricated bridge has a span of 42.67m without intermediate pier and a width of 7.5m. It can support two-way traffic comprising heavy vehicles with a total load of about 110MT.With a modular design facilitating easy assembly, these bridges can be erected quickly even in the most demanding of terrains and conditions.

 

These are ideal for remote areas as onsite installation infrastructure is not required.

 

Usually, the foundation takes about 28 days for the reinforced concrete pedestal to gather maximum strength, following which the bridge structure can be properly placed and fixed on it.

 

Considering these aspects, the bridge is expected to be thrown open to traffic in about 30-45 days from the day of commencement of foundation work.

 

With the launch of the new Bailey bridge, GRSE has reinforced its position as the largest manufacturer of bailey type portable steel bridges in India.

The pioneer has around 70% market share and has delivered over 5100 bridges to date in the 40 years since it started bridge fabrication.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm