April 14, 2026 07:01 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'ECI deviated from Bihar procedure': Supreme Court raises concerns over voter deletion in Bengal SIR | Noida workers’ protest turns violent: Stones pelted, vehicles damaged over wage hike demand | Oil prices jump above $103 a barrel as US moves to block Iran-linked shipping | I don’t care if they come back or not, says Trump after Iran talks collapse | Legendary singer Asha Bhosle suffers cardiac arrest, hospitalised | Big boost to India–Mauritius ties: S. Jaishankar hands over 90 e-buses | Middle East tension: Iranian delegation arrives in Islamabad for major talks, 10,000 security personnel deployed | Ranveer Singh visits RSS HQ amid Dhurandhar 2 success, triggers speculation | ED raids ex-Bengal minister Partha Chatterjee; SSC scam resurfaces ahead of polls | Amit Shah promises UCC, ₹3,000 aid per month for women and youth in BJP’s Bengal manifesto
Branwar bridge

Kashmir: Deputy Commissioner (DC) of Ganderbal inaugurates Branwar bridge

| @indiablooms | Sep 22, 2020, at 11:35 pm

Srinagar: Deputy Commissioner (DC) Ganderbal, Shafqat Iqbal on Sunday inaugurated the Branwar bridge constructed over the Power canal and upgradation work of Water Supply Scheme (WSS) Mammer B.

During his visit to Kangan Sub- division he also inspected several ongoing works.

The Executive Engineer R&B informed the DDC that the bridge was approved at the cost of Rs 1.50 crore with which over 10,000 souls of 4 villages including Mammer,

Thune, Awanpati and Branwar will be benefited.

On the occasion the DDC also inspected the progress of Thune-Branwar road of lengh 3 km which is approved at the cost of Rs. 5.90 crore.

The Executive Engineer R&B informed the DDC that the work on the road is in full swing and will get completed within stipulated timeframe.

Meanwhile, the DDC inaugurated the upgradation work at WSS Mammer-B which was approved under Back to Village 1 at the cost of Rs. 8.5 lakh The Executive Engineer PHE informed the DDC that with this up-gradation work morethan 10,000 souls of three villages including Mammer, Kasanapati and Thune will be supplied treated water through the same scheme now. 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.