September 16, 2026 12:15 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Gurugram biker hit by car: Two including main accused arrested after viral road rage video, attempt to murder case filed | Gurugram horror caught on camera: ‘I felt unsafe’—car chases, rams woman biker and flees | BRICS veg menu row: ‘Why shouldn’t we showcase it?’—Harsh Goenka hits back after Rahul Gandhi’s ‘80%’ remark | India-UAE Comprehensive Strategic Partnership in focus: Modi meets Abu Dhabi Crown Prince on BRICS sidelines | Xi Jinping lands in India for BRICS; big Modi meeting set for New Delhi | ‘Hospitality on another level’: South African official stunned by India’s BRICS hosting | Suvendu Adhikari eats fish bhog at Kalighat Temple amid Bageshwar Baba row | Bangladeshi Hindu monk Chinmoy Krishna Das breaks down emotionally as he gets 5-hour parole to attend mother’s funeral | Sheikh Hasina’s daughter Saima Wazed quits WHO post amid fraud allegations | After days of silence, China confirms Xi Jinping’s India visit for BRICS Summit
Branwar bridge

Kashmir: Deputy Commissioner (DC) of Ganderbal inaugurates Branwar bridge

| @indiablooms | Sep 22, 2020, at 11:35 pm

Srinagar: Deputy Commissioner (DC) Ganderbal, Shafqat Iqbal on Sunday inaugurated the Branwar bridge constructed over the Power canal and upgradation work of Water Supply Scheme (WSS) Mammer B.

During his visit to Kangan Sub- division he also inspected several ongoing works.

The Executive Engineer R&B informed the DDC that the bridge was approved at the cost of Rs 1.50 crore with which over 10,000 souls of 4 villages including Mammer,

Thune, Awanpati and Branwar will be benefited.

On the occasion the DDC also inspected the progress of Thune-Branwar road of lengh 3 km which is approved at the cost of Rs. 5.90 crore.

The Executive Engineer R&B informed the DDC that the work on the road is in full swing and will get completed within stipulated timeframe.

Meanwhile, the DDC inaugurated the upgradation work at WSS Mammer-B which was approved under Back to Village 1 at the cost of Rs. 8.5 lakh The Executive Engineer PHE informed the DDC that with this up-gradation work morethan 10,000 souls of three villages including Mammer, Kasanapati and Thune will be supplied treated water through the same scheme now. 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.