April 02, 2026 05:10 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
AAP drops Raghav Chadha from key parliamentary role, sparks buzz over internal rift | Amit Shah to camp in West Bengal for 15 days during Assembly polls; predicts Mamata’s defeat in state and Bhabanipur | 'BJP plotting President’s Rule, don’t fall in the trap': Mamata Banerjee on Malda unrest, urges peace | 'Most polarised state': CJI Kant raps Bengal govt over 9-hour hostage of judicial officers | Bengal SIR protest: Judge pleads for help amid mob attack after 9-hour hostage ordeal | Bengal SIR progress: 47 lakh of 60 lakh adjudicated cases disposed of, Supreme Court informed | Amit Shah to join Suvendu Adhikari on Bhabanipur nomination day; BJP plans mega roadshow | Fuel prices rise: Premium petrol, diesel hiked amid oil price surge | Commercial LPG up Rs 195.50 as global oil prices rise; domestic rates unchanged | Layoff alert: Oracle cuts 30,000 jobs globally, 12,000 hit in India
Jabalpur Airport
Work in Progress -Jabalpur airport new Terminal Building (Image Credit: PIB)

Jabalpur airport to get new terminal building with capacity to handle 500 passengers at peak hrs

| @indiablooms | May 16, 2022, at 01:01 am

The Jabalpur airport in Madhya Pradesh is being upgraded to include a new terminal building and an extension of runway among other additions at a cost of Rs 412 crore in view of rising passenger traffic.

Madhya Pradesh government handed over 483 acres of land to the Airport Authority of India (AAI) for development work in 2015, total land measuring to 774 acres.

The new terminal building equipped with world-class passenger facilities will have the capacity to handle 500 passengers during peak hours.

Spread over an area of 1,15,315 sq ft, the terminal building will have three aerobridges, an advanced baggage screening system, a modern food court in the landscape area, and well-planned car parking for more than 300 cars and buses.

The proposed terminal building will welcome the passengers with glimpses of vibrant Gond Paintings, local handicrafts, murals and popular tourist destinations of Madhya Pradesh.

The up-gradation work also includes the extension of runway to make the airport suitable for the operation of Airbus 320 type of aircraft, construction of a 28-meter-high new ATC tower and technical block (G+3) with all modern facilities, fire station (Category-VII) and other ancillary buildings like utility block, gatehouse etc.

The new building will be built with eco-friendly, sustainable material and equipped with solar plant and energy efficient equipment.

Solid waste management system, reuse of treated water for horticulture purposes and rainwater harvesting system with Sustainable Urban Drainage System are a few other green features of the airport up-gradation project.

Gateway to the tourist attractions like Kanha National Park, Bandhavgarh National Park, marble cliffs and waterfalls at nearby Bhedaghat, the airport serves the whole of eastern Madhya Pradesh, especially the Mahakaushal region.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.