May 23, 2025 10:52 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Trump administration bans Harvard University from enrolling international students | ED accuses Sonia Gandhi, Rahul Gandhi of cheating, money laundering in National Herald case | 'Russia, Ukraine will immediately start negotiations for ceasefire': Donald Trump after call with Putin | 'Jill and I have learned that we are strongest in the broken places': Joe Biden on cancer diagnosis | Rahul Gandhi targets Jaishankar over Op. Sindoor again, BJP says LoP speaking Pak language | Supreme Court orders SIT probe into Madhya Pradesh minister's remarks on Colonel Sofiya Qureshi | Bengaluru: Woman killed after wall collapses on her after heavy rainfall | Pak forces targeted Golden Temple after India conducted Operation Sindoor: Army | YouTuber Jyoti Malhotra, arrested for 'espionage', travelled to Pakistan ahead of Pahalgam attack | Centre picks Shashi Tharoor to head all-party delegation for 'exposing' Pak-backed terrorism globally

Assam Pollution Control Board withdraws closure notice on OIL operations

| @indiablooms | Jun 24, 2020, at 03:27 pm

Guwahati/IBNS: In a relief to the Oil India Limited(OIL), the Pollution Control Board of Assam (PCBA) has withdrawn its earlier closure notice on conditions which served OIL on oil exploration.

Earlier on Jun 19, the Pollution Control Board of Assam (PCBA) came heavily on Oil India Limited following the fire incident at Baghjan oil field in Assam’s Tinsukia district and served a closure notice to Oil India Limited on major oil exploration.

The Pollution Control Board of Assam (PCBA) had directed OIL to shut down all productions as well as the drilling operations at the site.

Following the PCBA notice, OIL moved the court seeking a stay on the closure notice.

In a letter issued by the PCBA on Jun 22 stated, “M/S Oil India Ltd shall have to submit a detailed time bound Environmental Management Plan within 15 (fifteen) days from the date of issue of this letter for environmental mitigation and extinguishing of fire at the Baghjan Oil Field and act accordingly.

They have to apply for Consent to Operate (CTO) under Section 25 of the Water (Prevention & Control of Pollution) At 1974 and Section 21 of the Air (Prevention & Control of Pollution) Act 1981 separately for each and every drilling, production and other installations along with environmental management plan and requisite documents within 1 (One) month.

They have to submit all the details of Hazardous Waste generated, disposed & treatment facilities as per the Hazardous & Other waste (Management & Transboundary Movement) Rules, 2016.”

“They have to apply for Authorization under E-Waste (Management) Rules, 2016 and take necessary action for proper disposal of E-waste and they have to submit the return as per Batteries (Management & Handling) Rules, 2001 framed under the Environment (Protection) Act, 1986 within 31st July, 2020,” said in the PCBA letter.

On the other hand, the Oil India Limited on Tuesday issued a press release and stated that the closure notice served by Pollution Control Board of Assam (PCBA) has been withdrawn.

“PCBA has asked OIL to fulfill certain conditions within specific timeframes. OIL will take necessary steps to comply with the directives/conditions of PCBA,” OIL said in the press release.

On the other hand, OIL said in the press release that, Environmental Impact Assessment by M/s ERM: Air monitoring/ Noise monitoring/ Ecological survey continues to be conducted by M/s ERM.

“TERI Study on Air quality & Noise level: Data of air quality and noise level are being constantly recorded and monitored at the Analyzers installed by TERI. TERI study on Bioremediation of Sludge: Initial cleaning job as a part of bio remedial process is being continued in the affected areas.

TERI is arranging Drone fly camera for aerial photography and videography of affected areas and survey will be carried out depending on weather condition. cSIR-NEIST/NGRI Seismological study: Recording for geophysical monitoring of tremors is in progress from all stations. Analysis of data will be carried out in Jorhat and Hyderabad. Many important equipment/ materials are on transit. Consignments are delayed on transit due to ban on day time movement of heavy vehicles.

Fabrication of Heat Shield: Fabrication of Heat Shields for Bulldozer and Excavator is in progress. There is a delay in developing the land due to inclement weather and soft soil condition. In order to mitigate the delay and make access of vehicles and placement equipment at the site. Portable deck mats for the purpose are on transit from Kolkata and Guwahati. Connections for sourcing water from Dangori River are underway,” OIL stated in the release.

The release also stated that two emergency Escape Routes from Debris Area and one from Kill pump area have been constructed and the Alert team is inspecting the equipment at OlL CMT Yard with ONGC-CMT and OIL Technical team.

Oil India Limited further said that OIL has been facing a production loss of 8291 MT Crude oil and 10.56 MMSCM of natural gas due to bandh, stoppage blockades since May 27.

Two firefighters were killed and four others injured in the gas well fire incident at Baghjan oil field and over 10,000 people living in the nearby villages were forced to take shelter in relief camps.

(Reporting by Hemanta Kumar Nath, Guwahati)

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Close menu