December 09, 2025 01:36 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Race against time! Indian Navy sends four more warships to Cyclone Ditwah-hit Sri Lanka | $2 billion mega deal! HD Hyundai to build shipyard in Tamil Nadu — a game changer for India | After 8 years of legal drama, Malayalam actor Dileep acquitted in 2017 rape case — what really happened? | Centre imposes temporary fare caps as ticket prices defy gravity amid IndiGo meltdown | 'Action is coming': Aviation Minister blames IndiGo for countrywide air travel chaos | In front of Putin, PM Modi makes bold statement on Russia-Ukraine war: ‘India is not neutral, we side with peace!’ | Rupee weakens following RBI repo rate cut | RBI slashes repo rate by 25 basis points — big relief coming for borrowers! | 'Mamata fooled Muslims': Humayun Kabir explodes after TMC suspends him over 'Babri Masjid-style mosque' demand; announces new party | Mosque in the middle of Kolkata airport? Centre confirms flight risks, BJP fires at Mamata
Kavach

Railways spent Rs 352 cr on implementation of anti-collision system Kavach so far in FY24

| @indiablooms | Aug 03, 2023, at 06:50 am

New Delhi: Indigenously developed anti-collision system 'Kavach' has so far been deployed on 1465 Route km and 121 locomotives (including Electric Multiple Unit rakes) on South Central Railway.

Minister of Railways Ashwini Vaishnaw informed this to Lok Sabha in a written response to a question on August 2.

The Indian Railways has awarded tenders for Delhi – Mumbai & Delhi – Howrah corridors, covering nearly 3000 Route km, the commuication added.

Work is in progress on these routes in West Bengal (229Rkm), Jharkhand (193Rkm), Bihar (227Rkm), Uttar Pradesh (943Rkm), Delhi (30Rkm), Haryana (81Rkm), Rajasthan (425Rkm), Madhya Pradesh (216Rkm), Gujarat (526Rkm), Maharashtra (84Rkm) States.

Indian Railways is preparing a Detailed Project Report (DPR) and a detailed estimate for another 6000 RKm.

Presently, there are three Indian OEMs who are approved for Kavach.

Efforts are being made to develop more vendors to enhance the capacity and scale up the implementation of Kavach.

The Cost for the provision of Trackside including Station equipment of Kavach is approximately Rs 50 Lakhs/Km and the cost for the provision of Kavach equipment on the loco is approximately Rs 70 lakh/ loco.

The amount spent so far on Kavach implementation is Rs 351.91 crores.

The budgetary allocation for Kavach during the year 2023-24 in Rs 710.12 crores.

The projects are sanctioned zone-wise and not State wise as Indian Railway’s projects may span across State boundaries. Therefore, state wise expenditure is not maintained.

Indigenously developed Automatic Train Protection (ATP) system Kavach aids the loco pilot in train running within specified speed limits by automatic application of brakes in case the Loco Pilot fails to do so and also helps the train safely run during inclement weather. Kavach was adopted as a National ATP system in July 2020.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm