April 25, 2026 10:11 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
YouTuber Saleem Wastik arrested in connection with 1995 kidnapping and murder case | Maharashtra Police makes first arrest months after Akshay Kumar revealed daughter’s cyber harassment | Big political shake-up: KCR’s daughter Kavitha floats new TRS after BRS fallout | ED raids multiple Bengal locations in PDS scam probe amid assembly polls | Bengal polls: Mob attacks central forces, 3 CAPF personnel injured in Birbhum | ‘People voting to protect their rights’: Mamata says high turnout backs TMC in Bengal | ‘Fear is being defeated’: PM Modi says high voter turnout signals BJP win in Bengal | Crude bomb attack in Murshidabad’s Nowda as violence hits Bengal polling | ‘Mamata Banerjee’s politics fuelled BJP growth in Bengal’: Rahul Gandhi | 'Will never forget’: Nation remembers Pahalgam victims as leaders vow strong fight against terror
MP
Image Credit: NHDC facebook page

Hydroelectric: NHDC to construct 525 MW pumped storage project at Rs 4,200 cr in Madhya Pradesh

| @indiablooms | Jun 10, 2023, at 02:23 am

New Delhi: Narmada Hydroelectric Development Corporation Ltd. (NHDC Ltd.) will construct a 525 MW Pumped Storage Project near Indira Sagar Dam, Khandwa in Madhya Pradesh at a cost of Rs 4,200 crores.

The project will use the existing reservoirs—Indira Sagar and Omkareshwar of the Indira Sagar Project.

Madhya Pradesh government’s New & Renewable Energy Department has allotted this project to NHDC Limited to meet the need for increasing peak hour demand of the state.

With the increased renewable energy generated through this Pumped Storage Project, the energy needs of the state can be met during peak energy hours, usually in the morning and evening.

The project will generate 1,226.93 million units of energy during peak hours.

Madhya Pradesh has the potential for 11.2 GW of Pumped Storage Projects.

At present, two power stations of NHDC Limited, namely Indira Sagar Power Station (1000 MW) and Omkareshwar Power Station (520 MW) are in operation in the Khandwa district.

The power produced by these power stations is supplied to Madhya Pradesh.

NHDC plans to bolster the state’s green energy production with the construction of solar power projects.

Constructions of an 8 MW solar project in the historic city of Sanchi and of an 88 MW floating Solar Project on Omkareshwar Reservoir are in progress.

NHDC Ltd. is a joint venture of NHPC Ltd. and the Government of Madhya Pradesh.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm