November 19, 2026 10:29 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'I want to meet Allah': LeT terrorist Lateef Bhat killed after refusing to surrender | ‘He is a very tough man’: Trump renews praise for PM Modi during Manila Quad summit | Delhi Horror: Building Collapses in Vivek Vihar, Two Dead, Eight Feared Trapped | Captain Amarinder Singh attends Sonia Gandhi's memoir launch, sparks Congress comeback buzz | Rahul Gandhi’s ‘Mumma On Papa’s Lap’ Remark Sparks Memes, BJP Jibe | Big breakthrough in Kashmir: Top Lashkar terrorist Latief Bhat eliminated in Kulgam | Modi's big diplomatic push: PM heads to Manila for two key global summits | Army mistook missing SPOs for terrorists and opened fire, claims J&K Congress chief; BJP hits back | 'Don't lecture India on democracy': Meloni ally hits out at Italian leader over 'vote chori' remark that drew Rahul Gandhi's laughter | 'Kisi ke baap ka Hindustan thodi hai': Diljit Dosanjh's fiery Rahat Indori response to Indore concert restrictions goes viral
GRSE

GRSE commissions 250 ton Goliath crane in Kolkata

| @indiablooms | Jun 23, 2021, at 08:47 pm

Kolkata/IBNS: Garden Reach Shipbuilders and Engineers Ltd. (GRSE), a Mini Ratna Category 1 defense PSU and a warship building company, has commissioned a 250 ton Goliath crane at its integrated main unit facility in Kolkata.

Rear Admiral VK Saxena, IN (Retd.), Chairman and Managing Director of GRSE commissioned the new crane in the presence of CMDE Sanjeev Nayyar, IN (Retd.), Director (Shipbuilding), including other senior officials of the company.

This Goliath crane has a capacity of 250 tonnes, a height of 59.6 meters, a width of 35.5 meters, and a span of 116 meters manufactured in M/s Sangsangin Marine, South Korea, and transported by sea to GRSE in a fully assembled condition.

This crane is equipped with an automated smart control system that requires just one operator to manage it.

Highlighting its significance, Saxena said, "The availability of the Goliath crane shall boost the production capacity of GRSE for undertaking concurrent construction with respect to its ongoing and future projects.

"It is understood that an evolution of transportation of a fully assembled Goliath crane by sea and the complex process of unloading from ship to shore directly on crane tracks has been undertaken for the first time in India."

The gigantic crane started its journey from Korea on Dec 6, 2020, and after overcoming rough weather and sea conditions of the South China Sea while maneuvering narrow sharp bends of Hooghly River, the vessel finally reached GRSE on February 21, the ship building expert said.

Overcoming technical challenges, finally, on Feb 26 the crane was parked in its position. Further activities including setting to work and trials were completed over the last four months. The crane got commissioned on Tuesday.

The shipyard has made a significant contribution towards ‘Atmanirbhar’ Abhiyaan through advancement in state-of-the-art warship design and construction by achieving over 90 per cent indigenous content onboard ASW Corvettes and Landing Craft Utility ships, GRSE said.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.