April 22, 2026 03:07 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘PM Modi is a terrorist’: Mallikarjun Kharge sparks row; BJP hits back | ‘What kind of order is this?’: Mamata slams ECI’s bike curbs in poll-bound Bengal, calls it ‘mischief’ | ‘90% of women can’t do politics without entering male politicians’ rooms’: Pappu Yadav sparks row; BJP targets Congress | Tim Cook to step down as Apple CEO; John Ternus named successor | 15 killed, 20 injured as bus plunges into gorge in J&K’s Udhampur | Oil jumps over 5% as Strait of Hormuz closure fuels supply fears | Pushback from smartphone makers: Centre drops Aadhaar app pre-install plan — report | Meta eyes first wave of layoffs on May 20: Report | TCS breaks silence on Nida Khan: ‘No HR role, no power’ in Nashik case | ‘Panic reaction’: Rahul Gandhi on women’s bill, says PM Modi ‘wants to send a message’
Economic Survey
Indian government tables Economic Survey in Parliament. Photo Courtesy: PIB

Govt's capital expenditure on key infrastructure sectors grew at a rate of 38.8 per cent from 2019-20 to 2023-24: Economic Survey

| @indiablooms | Jan 31, 2025, at 06:30 pm

The Economic Survey tabled in the Indian Parliament on Friday said the Union Government‘s capital expenditure on key infrastructure sectors has grown at a rate of 38.8 per cent from 2019-20 to 2023-24.

The survey stated that in 2024-25, capital expenditure picked up momentum between July and November 2024.

The survey was tabled by Union Finance Minister Nirmala Sitharaman in the Parliament.

The power sector network continues to expand, with installed capacity rising by 7.2 per cent year-on-year to 456.7 GW as of November 2024.

The addition of transformation capacity also gained momentum this year. In the shift towards renewable energy, the power sector has been bolstered primarily by large-scale solar and wind initiatives.

By the end of December 2024, the country's total renewable energy installed capacity increased by 15.8 per cent year-on-year (YoY), reaching 209.4 GW, up from 180.8 GW in December 2023.

With the implementation of the Revamped Distribution Sector Scheme, the daily average power supply has improved from 22.1 hours in FY14 to 23.4 hours in FY24 in the urban areas and from 12.5 hours in FY14 to 21.9 hours in the rural areas.

The gap between energy demand and supply has also declined from 4.2 per cent in FY14 to a mere 0.1 per cent by December 2024.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm