December 05, 2025 09:15 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
In front of Putin, PM Modi makes bold statement on Russia-Ukraine war: ‘India is not neutral, we side with peace!’ | Rupee weakens following RBI repo rate cut | RBI slashes repo rate by 25 basis points — big relief coming for borrowers! | 'Mamata fooled Muslims': Humayun Kabir explodes after TMC suspends him over 'Babri Masjid-style mosque' demand; announces new party | Mosque in the middle of Kolkata airport? Centre confirms flight risks, BJP fires at Mamata | Sam Altman is betting big on India! OpenAI in advanced talks with Tata to build AI infrastructure | Government removes mandatory pre-installation of Sanchar Saathi App. Know all details | Calcutta HC overturns controversial Bengal job annulment — 32,000 teachers rejoice! | Bengal SIR shock: 1 lakh ‘deceased voters’ found in Kolkata North! | Massive twist in Bengal voter list: ‘Perfect’ 2,280 booths shrink to just 480 after probe!
A view of Dr BR Ambedkar Metro station, Vidhana Soudha, in Bengaluru. (Image credit: wikipedia.org)

Bengaluru Metro's Yellow Line, connecting Electronics City, set to open by May 2025

| @indiablooms | Mar 10, 2025, at 08:56 pm

Bengaluru: Karnataka’s capital city, Bengaluru, is all set to have its much-awaited Yellow Line Metro, connecting RV Road to Bommasandra and passing through the tech hub of Electronics City, operational by May 2025, Deputy Chief Minister and Bengaluru Development Minister DK Shivakumar said on March 4, media reports said.

According to a Moneycontrol report, responding to a query from Bommanahalli MLA M Satish Reddy in the state assembly, Shivakumar confirmed, "The Yellow Line (19.1 km) from RV Road to Bommasandra will be opened for public service by May 2025."

Providing an update on the Pink Line (21.2 km, Kalena Agrahara to Nagawara), Shivakumar stated that the 7.5 km elevated stretch from Kalena Agrahara (Gottigere) to Tavarekere (Swagath Cross) is expected to be operational by December 2025, while the 13.7 km underground section from Dairy Circle to Nagawara is slated for completion by December 2026, the report said.

The Bengaluru Metro Rail Corporation (BMRCL) is currently grappling with a shortage of rolling stock, contributing to the delay in commencing Yellow Line operations, sources familiar with the matter told Moneycontrol.

According to a BMRCL official, operations on the Yellow Line are likely to begin with three trains running at a 30-minute frequency.

"We expect to receive the third train by April, followed by the fourth train, which will help us start operations," the official was quoted as saying by Moneycontrol.

Trial runs on the Yellow Line began on March 7, 2024. In February 2025, the Commissioner of Metro Rail Safety (South Circle), AM Chowdhary, inspected two CRRC Nanjing Puzhen trains—one imported from China and the other assembled in India by Titagarh Rail Systems.

The Yellow Line, initially scheduled to open in December 2021, faced prolonged delays primarily due to disruptions in rolling stock supply.

In December 2019, CRRC Nanjing Puzhen was awarded a contract to supply 216 coaches to BMRCL, with a delivery timeline of 173 weeks.

However, the Indo-China border standoff in June 2020, coupled with CRRC's struggle to identify a local manufacturing partner under the Make in India initiative, delayed coach supply.

Challenges such as the COVID-19 pandemic, foreign direct investment restrictions, and trade regulations further stalled the process.

Eventually, CRRC partnered with Kolkata-based Titagarh Rail Systems for local manufacturing and supply of coaches.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm