August 18, 2026 12:23 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
BJP reshuffles top organisation seven months after Nitin Nabin's elevation | West Bengal STF arrests suspected aide of ISI 'agent' Rana Rauf in Kolkata | ‘Very hopeful’: Indian envoy Dinesh Trivedi breaks silence on PM Tarique Rahman’s proposed India visit | Shehzad Poonawalla doubles down on BJP exit, urges party to accept resignation | Tarapith tragedy: Seven pilgrims killed as hotel goes up in flames before dawn | Bengal STF nabs suspected aide of ISI 'agent' Rana Rauf in Kolkata | After SC rebuke, BCI chief apologises to NALSAR students over enrolment freeze row | Independence Day: PM Modi’s big youth pitch— AI training, free coaching amid exam row and job concerns | ‘Shakti Ki Saptadhara’: Modi reveals 7 pillars to power India’s next leap in his I-Day speech from Red Fort | West Bengal STF arrests 3 more suspected Pakistani spies in Cooch Behar
Nepal Electricity
Representational image by Fre Sonneveld on Unsplash

Winter crisis: NEA plans to light up Nepali homes with Indian energy

| @indiablooms | Sep 24, 2022, at 04:27 am

Kathmandu: The Nepal Electricity Authority is planning to buy electricity from the Indian market under a six-month contract to meet the domestic demand market for power in winter.

The step will be taken at the time as  Nepal’s run-of-river hydropower projects dwindle.

By issuing a tender notice, the state-owned power utility body said that it would buy up to 365MW from Indian power traders from December 1 this year to May 31, next year, read The Kathmandu Post report.

The NEA plans to take delivery of 300MW from the Muzaffarpur substation through the Dhalkebar-Muzaffarpur cross-border transmission line and an additional 65MW through the Tanakpur substation. The electricity will be bought round-the-clock, the notice states.

Though Nepal has been exporting electricity currently because of surplus production by the hydropower projects fed by monsoon-swollen rivers, it has to import in the winter when water levels in the rivers fall and the plants produce in the range of 30-40 percent of their installed capacity.

Currently, the total installed capacity of Nepal’s power projects stands at around 2,200MW while peak hour demand for electricity on Wednesday stood at 1866MW, according to the NEA.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.