November 22, 2026 10:00 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Youth Congress workers storm Meta's Hyderabad office, smashes flower pots; gives 7-day ultimatum over account suspension | 'Resign out of shame!': Rajasthan Congress chief demands Bhajan Lal Sharma's exit after BJP's Rajasthan poll rout | Congress sweeps Rajasthan Panchayat polls! BJP suffers major setback as Gehlot, Pilot target ruling party | 'Dropped because his name is Siraj?': Congress alleges discrimination, BJP hits back over pacer's exclusion | Rahul Gandhi's 'compromised PM' jibe at Modi over Trump-Putin-Xi meet leaves BJP fuming | ‘Cyclone Akvan weakens after landfall in Odisha, heavy rain triggers waterlogging in several areas’ | 'No talks until terror stops': Rahul Gandhi's blunt message to Pakistani student in US | 'Khao, peeyo, mauj karo' not Indian culture: PM Modi's big message on savings | Muhammad Yunus's ancestral home set ablaze as Hasina's Awami League flexes street power in Bangladesh | Flower Shower Turns Fatal: 12-Year-Old Dies in Bulldozer Accident at Akhilesh Yadav's Rally
Japan
Photo Courtesy: UNI

Japan to release 54,600 tons of Fukushima nuclear wastewater in 2024

| @indiablooms | Jan 26, 2024, at 11:41 pm

The operator of Japan's crippled Fukushima nuclear power plant, Tokyo Electric Power Company (TEPCO), has announced a plan to release around 54,600 tons of nuclear-contaminated water from the facility into the ocean in fiscal 2024.

The volume is expected to be discharged into the Pacific Ocean in seven rounds, starting from April 1, 2024, to March 31, 2025, according to the plan announced Thursday.

TEPCO is slated to finalize the discharge plan by the March 31 end of fiscal 2023, it said.

Despite concerns and oppositions among local fishermen in Fukushima Prefecture as well as other countries, the Fukushima wastewater discharge started in August 2023. In fiscal 2023, TEPCO is set to release a total of about 31,200 tons of radioactive wastewater in four batches, with the fourth and final round for the year scheduled late next month.

Hit by a 9.0-magnitude earthquake and an ensuing tsunami on March 11, 2011, the Fukushima nuclear plant suffered core meltdowns that released radiation, resulting in a level-7 nuclear accident, the highest on the International Nuclear and Radiological Event Scale.

The plant has been generating a massive amount of water tainted with radioactive substances from cooling down the nuclear fuel in the reactor buildings, which are now being stored in tanks at the nuclear plant.

(With UNI Inputs)

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.