June 28, 2026 04:49 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Fresh paper leak rocks India: Maharashtra TET postponed a day before exam, over 4 lakh aspirants affected | Pune fort murder case: Siya Goyal's brother says family would have called off marriage if she had objected | Donald Trump gets a road named after him in India, says 'Thank You!' | Fresh setback for Gautam Adani? US judge asks DoJ to justify dropping criminal charges | Ram Mandir Trust chief Champat Rai resigns as alleged donation siphoning row escalates | Ram Mandir fund row deepens: 8 arrested days after BJP called allegations 'false narrative' | 'Who tied the hands of CBI?': Calcutta HC on RG Kar case; victim's mother, now BJP MLA, says she is 'deeply disturbed' | Construction comes to a standstill at nearly 700 Kolkata projects after Taratala warehouse tragedy kills 15 | World Cup shocker! Ecuador stun Germany 2-1, storm into Round of 32 | Iran-US conflict: Cargo vessel hit near Strait of Hormuz, UN agency pauses evacuation operations
Tunnel Collapse
Photo courtesy: X/UttarkashiPol

Uttarakhand tunnel collapse: Trapped workers five metres away from the rescuers

| @indiablooms | Nov 28, 2023, at 04:34 pm

Forty-one workers, who are trapped under the debris caused by the tunnel collapse in Uttarakhand's Uttarkashi for 17 days, are just five metres away from the rescue team, media reports said.

Manual horizontal drilling started on Monday at the Uttarakhand tunnel, reports said.

The process started this evening after the American Augur Drill broke again, its blades fouled up by an iron grill from the tunnel ceiling and other debris.

The work is being conducted by "rat miners"—labourers used to drill narrow shafts as part of a primitive method of coal extraction.

The vertical drilling to create an extra passageway has already progressed to 36 meters, officials said.

Manual drilling from top and side are the two methods on which rescue workers are focussing after several other methods failed. Horizontal drilling from the Barkot end of the tunnel is also in progress.

Neeraj Khairwal, Secretary, Uttarakhand government, said 24 rat miners will work 24 hours to remove manual debris. The work will be done in three shifts.

The Auger Machine, once in working condition, will push the 800-mm pipe forward as the manual drilling progresses.

The officials, however, refused to give a time frame for the rescue.

Manual drilling is a slow and labor-intensive process in which the rat-hole miners will go through the 800 mm pipe, drill manually, and bring out the debris with shovels.

With 10 to 12 meters left to reach the trapped workers and machine drilling options exhausted, manual drilling appears to be the only way forward, the authorities indicated.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.