August 16, 2026 04:28 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
After SC rebuke, BCI chief apologises to NALSAR students over enrolment freeze row | Independence Day: PM Modi’s big youth pitch— AI training, free coaching amid exam row and job concerns | ‘Shakti Ki Saptadhara’: Modi reveals 7 pillars to power India’s next leap in his I-Day speech from Red Fort | West Bengal STF arrests 3 more suspected Pakistani spies in Cooch Behar | Bengal man arrested in Bengaluru over terror links, Afghanistan travel plan | Ajit Doval breaks silence on Operation Sindoor in Discovery’s explosive new docuseries | Rahul Gandhi's 'mock hug' taunt sparks row; Centre stresses 'mutual respect' with Italy | Delhi on high alert: Bomb threat to High Court, airport and multiple locations ahead of I-Day | ‘Who are they to interfere?’: CJI Surya Kant slams Bar Council of India over NALSAR students’ enrolment row | 'Shows how low Congress has sunk': BJP slams Rahul Gandhi over Modi foreign policy jibe
Tunnel Collapse
Image of rescue ops tweeted by Uttarkashi Police

Uttarakhand tunnel collapse: Operation to rescue 41 trapped workers in final phase

| @indiablooms | Nov 23, 2023, at 06:50 pm

The operation to rescue 41 workers, who are trapped under the debris caused by a collapsed tunnel in Uttarakhand's Uttarkashi, has reached its final phase, media reports said.

The rescue teams at midnight said about 10 metres of debris is now separating them from the workers who are trapped for 12 days, NDTV reported.

Forty-one ambulances have been kept outside to carry the trapped workers to take to hospital.

Other factors like the difference in temperature between the tunnel and outside, the workers' psychological impact have been kept in mind.

A doctor along with the National Disaster Response Force (NDRF) team will reach the workers and check their conditions once the rescue pipe reaches them.

The workers will walk through the pipe under close supervision of the NDRF, NDTV reported.

The labourers have been trapped in a 400-metre buffer zone of the unfinished main tunnel since November 12 when a portion of the 4.5-km tunnel on the Brahmakal-Yamunotri National Highway collapsed, trapping 41 workers.

The tunnel - meant to join Silkyara and Dandalgaon in Uttarkashi - is a part of the Char Dham project.

On Monday morning, a wider pipe was installed to deliver a wider variety of food and medicine to the trapped people. Earlier, only dry fruits could be sent in.

The rescue ops involved an international tunneling expert team and a robotics team from defence research organization (DRDO).

Over the last week, several plans to cut through the 40-meter rock wall fell through.

The last rock fall occurred on Friday when attempts were made to use an American Auger drill flown in from Delhi. The drill machine that was being used before that had broken down and work had to be stopped till the new one reached.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.