March 31, 2026 05:23 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Sensex plunges 1,600 pts, Nifty below 22,400 as oil price spike rattles markets | Nitish Kumar quits as Bihar CM after Rajya Sabha entry | Modi says govt taking steps to shield Indians from impact of Middle East crisis | Bengal polls a ‘fight for liberation from fear’, says Amit Shah as he unveils TMC chargesheet | ‘Won’t mix politics with sport’: Bangladesh lifts IPL broadcast ban | ‘Feeling blessed’: PM Modi attends Surya Tilak ceremony at Ayodhya Ram Temple virtually | ‘No lockdown’: Union Minister Hardeep Singh Puri dismisses rumours, assures preparedness amid West Asia tensions | Middle East crisis: Govt cuts excise duty by Rs 10 on petrol and diesel, giving big relief amid global oil shock | ‘Big boost for NCR connectivity’: PM Modi to inaugurate Noida International Airport Phase 1 tomorrow | HDFC chairman Atanu Chakraborty resigned over power struggle with CEO Sashidhar Jagdishan: Report
Tunnel collapse
Photo courtesy: Uttarkashi Police X page

Rat-hole miners begin manual drilling at Uttarakhand tunnel to rescue 41 trapped workers

| @indiablooms | Nov 28, 2023, at 06:20 am

Manual horizontal drilling has started at the Uttarakhand tunnel where 41 men have been trapped for more than two weeks, reports said.

The process started this evening after the American Augur Drill broke again, its blades fouled up by an iron grill from the tunnel ceiling and other debris.

The work is being conducted by "rat miners"—labourers used to drill narrow shafts as part of a primitive method of coal extraction.

The vertical drilling to create an extra passageway has already progressed to 36 meters, officials said.

Manual drilling from top and side are the two methods on which rescue workers are focussing after several other methods failed. Horizontal drilling from the Barkot end of the tunnel is also in progress.

Neeraj Khairwal, Secretary, Uttarakhand government, said 24 rat miners will work 24 hours to remove manual debris. The work will be done in three shifts.

The Auger Machine, once in working condition, will push the 800-mm pipe forward as the manual drilling progresses.

The officials, however, refused to give a time frame for the rescue.

Manual drilling is a slow and labor-intensive process in which the rat-hole miners will go through the 800 mm pipe, drill manually, and bring out the debris with shovels.

With 10 to 12 meters left to reach the trapped workers and machine drilling options exhausted, manual drilling appears to be the only way forward, the authorities indicated.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.