August 12, 2026 06:19 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Jharkhand student protest turns tense: Water cannons, lathicharge after Assembly march barricades breached | ‘Mother tongue is as pure as one's mother’: Vijay-led Tamil Nadu government makes Tamil Thaai Vazhthu mandatory in big language push | Indian envoy Kwatra cites US, UK laws to counter ‘myths’ around FCRA Bill | Jharkhand students march to assembly today: JPSC row escalates despite govt action | ‘A morning I will cherish’: Raghav Chadha meets PM Modi, shares photos from ‘enriching’ meeting | Delhi Mercedes crash kills 70-year-old woman: Cop’s son behind wheel, beer bottle found | Indian-origin woman accused of ‘visa fraud’ on X: US Attorney steps in with major clarification | US Senate passes Russia sanctions bill: India can face Trump’s 100% tariff threat | Expired meat, rotten vegetables found at Bengaluru's luxury hotels, legal action begins | 'I'm ready to be humiliated': Vijay, Udhayanidhi Stalin clash in Tamil Nadu Assembly over Cauvery dispute
Image courtesy: nhsrcl.in

Railway Minister reviews progress of India’s first undersea tunnel for bullet train

| @indiablooms | Jan 18, 2025, at 11:41 pm

Mumbai: Railway Minister Ashwini Vaishnaw on Saturday reviewed the construction of India's first undersea tunnel, part of the Mumbai-Ahmedabad High-Speed Rail Corridor, commonly known as the bullet train project.

During his visit to Ghansoli, Navi Mumbai, Vaishnaw expressed satisfaction with the progress, emphasising the transformative potential of the multi-billion-dollar initiative.

The 21-kilometre undersea tunnel, including a seven-kilometre stretch under Thane Creek, will connect Mumbai's Bandra Kurla Complex (BKC) station to Shilphata.

Trains in the tunnel will operate at speeds of 250 km/h, faster than Kolkata Metro's under-river tunnels.

Vaishnaw assured that the design prioritises safety, environmental conservation, and efficient ventilation and lighting.

“The construction of 340 kilometres of the corridor is progressing well,” he noted, adding that bridge and station infrastructure work is advancing steadily.

The BKC station will be an architectural marvel with 10 underground floors and seven above-ground levels.

Spanning 508 kilometres and featuring 12 stations across Maharashtra and Gujarat, the bullet train will significantly reduce travel time, enhance commuter productivity, and spur urban development along the corridor.

Vaishnaw described the project as an economic integration initiative, set to elevate India's infrastructure and promote growth.

He praised the contributions of Indian engineers, calling the project a national pride.

Estimated at Rs 1.08 lakh crore and powered by Japanese railway technology, the Mumbai-Ahmedabad High-Speed Rail project is expected to be completed soon, boosting the economies of cities along the route, particularly Mumbai and Ahmedabad.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.