September 28, 2026 10:47 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'Asif bhai gun nikal': 17-year-old's chilling account of men posing as cops raping her in South Delhi park | Indian passport rules changed: New validity, fees for children and adults explained | 'Terrorism by Pakistan will have consequences': India issues blunt warning at UNGA | Trouble for Gyanesh Kumar? Plea filed in Supreme Court seeking prosecution of CEC | Air India pilot suspended after failing alcohol test before Zurich-Delhi flight, weeks after marijuana case | 'Don't be selective, boycott all elections': CJP's Abhijeet Dipke's blunt message to Opposition | 'Resign by tomorrow or face nationwide protest from October 2': CJP's Abhijeet Dipke's fresh warning to Gyanesh Kumar | 'Locked' iPhone 17 at centre of mystery surrounding IIT Bombay student's death | 'Rahul Gandhi is devoid of wisdom and knowledge': BJP hits back over 'vote theft' claim | ‘How does anti-incumbency disappear?’: Rahul Gandhi targets Modi, Shah in fresh ‘vote chori’ attack, demands Gyanesh Kumar’s resignation
Image courtesy: nhsrcl.in

Railway Minister reviews progress of India’s first undersea tunnel for bullet train

| @indiablooms | Jan 18, 2025, at 11:41 pm

Mumbai: Railway Minister Ashwini Vaishnaw on Saturday reviewed the construction of India's first undersea tunnel, part of the Mumbai-Ahmedabad High-Speed Rail Corridor, commonly known as the bullet train project.

During his visit to Ghansoli, Navi Mumbai, Vaishnaw expressed satisfaction with the progress, emphasising the transformative potential of the multi-billion-dollar initiative.

The 21-kilometre undersea tunnel, including a seven-kilometre stretch under Thane Creek, will connect Mumbai's Bandra Kurla Complex (BKC) station to Shilphata.

Trains in the tunnel will operate at speeds of 250 km/h, faster than Kolkata Metro's under-river tunnels.

Vaishnaw assured that the design prioritises safety, environmental conservation, and efficient ventilation and lighting.

“The construction of 340 kilometres of the corridor is progressing well,” he noted, adding that bridge and station infrastructure work is advancing steadily.

The BKC station will be an architectural marvel with 10 underground floors and seven above-ground levels.

Spanning 508 kilometres and featuring 12 stations across Maharashtra and Gujarat, the bullet train will significantly reduce travel time, enhance commuter productivity, and spur urban development along the corridor.

Vaishnaw described the project as an economic integration initiative, set to elevate India's infrastructure and promote growth.

He praised the contributions of Indian engineers, calling the project a national pride.

Estimated at Rs 1.08 lakh crore and powered by Japanese railway technology, the Mumbai-Ahmedabad High-Speed Rail project is expected to be completed soon, boosting the economies of cities along the route, particularly Mumbai and Ahmedabad.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.