December 25, 2025 08:37 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Tarique Rahman returns to Bangladesh after 17 years | Shocking killing inside AMU campus: teacher shot dead during evening walk | Horror on Karnataka highway: sleeper bus bursts into flames after truck crash, 9 killed | PM Modi attends Christmas service at Delhi church, sends message of love and compassion | Delhi erupts over lynching of Hindu man in Bangladesh; protest outside High Commission | Targeted killing sparks global outrage: American lawmakers condemn mob lynching of Hindu man in Bangladesh | Assam on a ‘powder keg’: Himanta Biswa Sarma flags demographic shift, Chicken’s Neck fears | Bangladesh on edge: Student leader shot as pre-poll violence deepens after Hadi killing | Historic deal sealed: India, New Zealand sign landmark Free Trade Agreement in record time | Supreme court snubs urgent plea to stop PMO’s chadar offering at Ajmer Sharif

Major power-cut hits Kolkata, throws Metro service out of gear

| | Feb 23, 2017, at 09:02 pm
Kolkata, Feb 23 (IBNS): Metro rail service in Kolkata was disrupted for nearly 15 minutes on Thursday morning as a 750 MW power station of Calcutta Electric Supply Corporation (CESC) went out of order, reports said.

According to reports, three power units of CESC's Budge Budge power station, which supplies power to Kolkata mostly, had suddenly stopped working at around 9:53 am.

Due to the power-snap, supply of electricity was disrupted as several locations in north, south and central part of the city.

Power supply was also affected at a few hospitals in Kolkata due to the power glitch.

"Following a network disturbance, all the three power units of the 750 MW Budge Budge power station of CESC tripped this morning at 9:53 am," a senior CESC official said.

Later, CESC took power from West Bengal State Electricity Board and brought the situation under control soon.

"Restoration of emergency supply began immediately and key supplies were restored in stages in most places within 15 minutes. All supplies were restored by about 10:30 am," the official added.

Meanwhile, Kolkata Metro service was disrupted due to the power cut and thousands of passengers were stranded underground during peak office hour as metro rakes got stuck inside the tunnel and at several stations, according to reports.

CPRO of Kolkata Metro, Indrani Banerjee, told IBNS: "As power supply was stopped due to CESC's power cut, metro service was disrupted from 9:53 am. to 10:08 am."

"The incident was very unfortunate for Kolkata metro and CESC as well. We, however, run extra trains to normalize the metro service," Indrani Banerjee said.

However, West Bengal Chief Minister Mamata Banerjee has called for a high-level meeting at the state secretariat at Nabanna to discuss the matter.

(Reporting by Deepayan Sinha, Image: Facebook)     

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.