December 22, 2025 09:54 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bangladesh on edge: Student leader shot as pre-poll violence deepens after Hadi killing | Historic deal sealed: India, New Zealand sign landmark Free Trade Agreement in record time | Supreme court snubs urgent plea to stop PMO’s chadar offering at Ajmer Sharif | Emergency landing drama: Air India flight heads back to Delhi after engine malfunction! | PM Modi slams ‘cut and commission’ TMC in virtual Taherpur address | US launches Operation Hawkeye Strike in Syria targeting ISIS after Americans killed | Horror on tracks: Rajdhani Express ploughs into elephant herd, eight killed in Assam | Horror in Bangladesh: Hindu man lynched and set on fire amid violent protests | Bangladesh in flames: Student leader Sharif Osman Hadi's death triggers massive protests, media offices torched | Chaos in Dhaka! Protesters assault New Age Editor, burn down newspaper offices amid deadly unrest
PMGSY
Unsplash

J&K: Roads construction under PMGSY in Baramulla in full swing despite Covid-19

| @indiablooms | Aug 09, 2020, at 11:41 pm

Srinagar: Jammu and Kashmir seems to be benefiting from the Pradhan Mantri Gram Sadak Yojana (PMGSY) as the construction of a road under it is now gaining pace after a brief halt due to COVID-19 imposed lockdown.

The government has approved up-gradation of the 5.25-km road from NH1A 46th Delina to Singhpora in Baramulla and the work is being executed under PMGSY at the cost of Rs.443.65 lakhs, reports ANI news agency.

Tara Singh, Sarpanch, Singhpora told ANI that the road is being constructed using better-quality materials. 

Local residents are facing hardships due to the road condition.

"We were waiting for the construction of the road in our area for several years. This wish is being fulfilled. The engineering team and other workers are doing work with great dedication," Rajveer Singh, a local resident told ANI.

"The length of the road is 5.25 kilometres and the project is sanctioned for Rs 443 lakhs," Peer Shahjahan Muhammad, Executive Engineer, PMGSY Division Baramulla told the Indian news agency.

 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.