April 10, 2026 04:58 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Amit Shah promises UCC, ₹3,000 aid per month for women and youth in BJP’s Bengal manifesto | Nitish Kumar takes Rajya Sabha oath; power shift looms in Bihar | Sting video fallout: AIMIM snaps electoral ties with Humayun Kabir in Bengal | Israel says Hezbollah chief’s nephew-cum-secretary killed in Beirut strikes last night | Modi slams TMC on trade, fisheries at Haldia; vows 7th pay commission for govt employees | ‘US military will remain in and around Iran’: Trump amid fragile ceasefire | BJP eyes Assam hattrick, Puducherry comeback; LDF faces Kerala test | Israel claims Hezbollah chief's nephew killed in Beirut strikes last night | Jaishankar’s high-stakes diplomatic tour: EAM to visit UAE this week, first visit amid Middle East conflict | Passport row: Barricades outside Pawan Khera’s Hyderabad house after Himanta Biswa Sarma's warning
Manoj Sinha
Image: PIB

Jammu and Kashmir: Nitin Gadkari inspects Zojila Tunnel

| @indiablooms | Apr 10, 2023, at 11:23 pm

Union Minister for Road Transport and Highways Nitin Gadkari today inspected Zojila Tunnel, Asia's longest tunnel to establish all-weather connectivity for Ladakh and an important project implemented in Jammu and Kashmir with the Lieutenant Governor of Jammu and Kashmir Manoj Sinha and members of Parliament of Parliamentary Consultative Committee on Road Transport and Highways.

19 tunnels are being constructed in Jammu and Kashmir at a cost of Rs  25000 crore.

Under this, the construction of 13.14 km long tunnel and approach road at a cost of Rs 6800 crore is in progress in Zojila. It is a 7.57 m high horseshoe-shaped single-tube, 2-lane tunnel, which will pass under the Zojila Pass in the Himalayas between Ganderbal in Kashmir and Drass town in Kargil district of Ladakh.

The project includes a Smart Tunnel (SCADA) system, which has been constructed using the New Austrian Tunneling Method.

It is equipped with facilities like CCTV, radio control, uninterrupted power supply, ventilation. The use of modern technology in this project has saved the Government of India more than 5000 crore rupees.

Under the Zojila Tunnel project,the main Zojila tunnel of 13,153 meters with 4 culverts of total length of 810 meters, 4 Nilgrar tunnels of total length of 4,821 meters, 8 cut and covers of total length of 2,350 meters and three 500 meters, 391 meters and 220 meters of  vertical ventilation shaft are proposed. So far 28% work of Zojila Tunnel has been completed.

With the construction of this tunnel, there will be all-weather connectivity for Ladakh.

Curently, the average travel time to cross the Zojila Pass sometimes takes three hours, after the completion of this tunnel the travel time will come down to 20 minutes.

The reduction in travel time will ultimately result in fuel savings.

The terrain near Zojila Pass is extremely inhospitable, with many fatal accidents taking place here every year. After the completion of Zojila Tunnel, the chances of accidents will be zero.

This tunnel will provide year-round connectivity between the Kashmir Valley and Ladakh, which will be extremely important for the development of Ladakh, promotion of tourism, free movement of local goods and movement of Indian armed forces in case of emergency.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.