December 15, 2025 05:03 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Caught in Thailand! Fugitive Goa nightclub owners detained after deadly fire kills 25 | After Putin’s blockbuster Delhi visit, Modi set to host German Chancellor Friedrich Merz in January | Delhi High Court slams govt, orders swift compensation as IndiGo crisis triggers fare shock and nationwide chaos | Amazon drops a massive $35 billion India bet! AI push, 1 million jobs and big plans revealed at Smbhav Summit | IndiGo’s ‘All OK’ claim falls apart! Govt slaps 10% flight cut after weeklong chaos | Centre finally aligns IndiGo flights with airline's operating ability, cuts its winter schedule by 5% | Odisha's Malkangiri in flames: Tribals rampage Bangladeshi settlers village after beheading horror! | Race against time! Indian Navy sends four more warships to Cyclone Ditwah-hit Sri Lanka | $2 billion mega deal! HD Hyundai to build shipyard in Tamil Nadu — a game changer for India | After 8 years of legal drama, Malayalam actor Dileep acquitted in 2017 rape case — what really happened?

India's first high speed train to be out in November, media reports

| | Sep 11, 2014, at 09:55 pm
New Delhi, Sept 11 (IBNS): If things go as planned, India’s first high-speed train is going to see the light of the day as early as November, media reported.

According to NDTV, the first high speed train with a speed of 160 kilometer per hour will run on Delhi-Agra section in November this year as Kapurthala Rail Coach Factory (RCF) in Punjab is all set to roll out first rake of fourteen coaches of the train.

It has been learnt that, the railway board and officials of railway department had already conducted a trial on these coaches on the Delhi-Agra section at a speed of 160 kilometer and covered the 200 kilometer distance in 99 minutes few days ago.

Shells of the first rake of high speed coaches had been manufactured and the work was going on at fast pace to roll out the first rake by the end of October this year so that the high speed train could run on Delhi-Agra section in November's first week, RCF General Manager Parmod Kumar is quoted by media as saying.

As per media reports, RCF engineers in consultations with Research Development and Standard organizations (RDSO) had made some changes in the designing of coupler system for a smoother ride compared to the Shatabdi and Rajdhani coaches.

Installation of smoke and fire detection system, and automatic sliding of inner doors besides TV infotainment system in the executive chair cars with LED fittings on the back of chair cars are also being done.

Although initially the speed of these trains would be 160 kilometer on select rail routes and gradually speed would be enhanced up to 200 kilometer after upgrading the signaling system and barricading the area.

Kumar said that the approximate cost of one high speed coach would be between Rs 2.25 to 2.50 crore, media reported. 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.