June 29, 2026 03:13 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Fresh paper leak rocks India: Maharashtra TET postponed a day before exam, over 4 lakh aspirants affected | Pune fort murder case: Siya Goyal's brother says family would have called off marriage if she had objected | Donald Trump gets a road named after him in India, says 'Thank You!' | Fresh setback for Gautam Adani? US judge asks DoJ to justify dropping criminal charges | Ram Mandir Trust chief Champat Rai resigns as alleged donation siphoning row escalates | Ram Mandir fund row deepens: 8 arrested days after BJP called allegations 'false narrative' | 'Who tied the hands of CBI?': Calcutta HC on RG Kar case; victim's mother, now BJP MLA, says she is 'deeply disturbed' | Construction comes to a standstill at nearly 700 Kolkata projects after Taratala warehouse tragedy kills 15 | World Cup shocker! Ecuador stun Germany 2-1, storm into Round of 32 | Iran-US conflict: Cargo vessel hit near Strait of Hormuz, UN agency pauses evacuation operations
Indian Railways
Photo courtesy: UNI

Indian Railway runs track car successfully on Indo-Bangladesh line from Agartala

| @indiablooms | Aug 25, 2023, at 04:55 am

Agartala/IBNS/UNI: The Indian Railway on Tuesday made a successful run of a specially designed track car on the newly built railway line for the most ambitious cross-border connectivity between India and Bangladesh from Agartala, which will connect Kolkata via Dhaka.

Railway officials here on Wednesday said that an uninterrupted run of track cars cleared the way for a trial run of a railway engine between Agartala and Gangasagar railway stations in Akhaura, Bangladesh, which took about 75 minutes to reach the zero line at the international border.

Officials said the test train will take a few more days to finalise all necessary preparations.

However, there has been an indication that perhaps the inauguration of Indo-Bangladesh train service will happen on September 9, when the Prime Ministers of both countries will sit together in New Delhi.

The track car, responsible for laying stones on the railway line, has been operational on the route for several days, and thereafter, a trial run of the railway engine will take place, the officials stated.

Meanwhile, Sharat Sharma, head of the project on the Bangladesh side, claimed that around 6.5 kilometers of track have been laid in the Akhaura section and that the entire railway line will be ready for train movement within a week in Bangladesh.

The Ministry of Development of the Northeast Region (DoNER) sanctioned Rs 580 crore for the construction of a railway corridor of 5 km in the Indian part connecting Agartala with Bangladesh in 2016.

The Ministry of External Affairs has also funded the remaining 10 km of railway stretches in Bangladesh territory, which were supposed to be completed five years ago.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.