January 28, 2026 11:06 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'None will be harassed': Dharmendra Pradhan breaks silence as UGC rules trigger student protests | Massive student uprising rocks Modi govt over new UGC rules on caste discrimination | Ajit Pawar no more: Maharashtra Deputy CM dies in Baramati plane crash | India, EU sign historic trade deal | ‘Dear Indian Friends’: Macron’s Republic Day message to India melts hearts | ‘Dhurandhar’ actor Nadeem Khan arrested in rape case; housemaid alleges abuse on marriage promise | Non-Hindus may no longer be allowed in Badrinath and Kedarnath — temple committee confirms | ‘No less than a concert’: PM Modi lauds India’s new bhajan club culture among Gen Z | Constitution ‘sacrosanct’ to PM Modi: Shashi Tharoor’s statement sets political chatter ablaze | A little piece of Greenland': Elon Musk takes a dig at Trump's Board of Peace at Davos

Orbital ATK conducts test of Antares first stage

| | Jun 01, 2016, at 03:00 pm
Washington, June 1 (IBNS) Orbital ATK conducted a full-power test of the upgraded first stage propulsion system of its Antares medium-class rocket using new RD-181 main engines. The 30-second test took place at 5:30 p.m. (EDT) on May 31, 2016 at Virginia Space’s Mid-Atlantic Regional Spaceport (MARS) Pad 0A.

Initial indications suggest that the test was fully successful, and the Antares engineering team will review test data over the next two weeks to confirm that all test parameters were met. The confirmation of a successful test will clear the way for Orbital ATK to resume cargo resupply services to the International Space Station from NASA’s Wallops Flight Facility in Virginia, currently scheduled for July.

“Early indications show the upgraded propulsion system, core stage and launch complex all worked together as planned,” said Mike Pinkston, Orbital ATK General Manager and Vice President, Antares Program. “Congratulations to the combined NASA, Orbital ATK and Virginia Space team on a successful test.”

The primary goal of the test was to verify the functionality of the integrated first stage, including new engines, modified Stage 1 core, avionics, thrust vector control and pad fueling systems in an operational environment, read the NASA website.

The test also met a number of operational milestones including full propellant loading sequence, launch countdown and engine ignition and shut down commands, as well as multiple throttle settings including full engine power. Additionally, the test validated the launch pad’s operation, including propellant tanking and the use of the water deluge system to protect the pad from damage and suppress noise. 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.