July 11, 2026 11:30 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'Highway blocked, stones pelted, cops injured': BJP faces open revolt in Madhya Pradesh over Narottam Mishra ticket snub | Two Kolkata Police DCPs suspended over alleged remarks against Bengal CM Suvendu Adhikari | Bail to Bloodbath: Telangana man allegedly kills wife, kids and teen who accused him of sexual harassment | Prakash Raj gets bail in multiple voter registration case linked to 2019 polls | ED raids Shekhar Suman associate's premises in FEMA case; phone allegedly thrown from 13th floor | 'Candidate fled': Prashant Kishor jibes BJP over Bankipur nominee change | BJP replaces candidate days before high-stakes Bankipur bypoll | Foreign franchise league enters India! BBL opener to be played in Chennai, announce Modi-Albanese | 'They could have stopped me': Vijay blames police, former DMK government over Karur stampede | 'People will correct their 2025 mistake': Electoral debutant Prashant Kishor predicts BJP defeat in Bankipur

"Mangalyaan" clears rehearsal test, readies for D-day

| | Sep 22, 2014, at 09:41 pm
Sriharikota, Sept 22 (IBNS): India,s Mars Orbiter Mission (MOM) satellite "Mangalyaan" on Monday cleared a crucial four-second motor fire test just 48 hours ahead of its insertion into the martian orbit, when history will be created, media reported.

Indian Space Research Organization (ISRO) officials said on Monday that MOM successfully cleared the crucial liquid engine firing test which was important in determining the fate of Mars Orbiter mission.

According to media reports, at 2:30 pm on Monday the craft’s 440 Newton Liquid Apogee Motor engine, the main rocket engine of the satellite, which has been lying dormant for this extended period, was successfully test-fired.

Along with that the fourth and final trajectory corrections were also performed. M Annadurai, programme director at Isro said, the test firing is like a trial.

The dormant engine has been brought back to life. ISRO said, the Mars orbiter satellite is carrying one large rocket motor and eight smaller thrusters.

Launched on November 5 last year, India's Mangalyaan embarked on a 680-million-km journey has been successfully braving the rough weather in space, it added.

Now during the last 300-days journey towards the red-planet, the main engine had been lying in dormant stage.

Now it needed to be checked before MOM enters in Martian atmosphere on 24 September.

Though the rockets were in “idle” for a long-time, scientists were confident about its performance.

The big rocket motor on board Mangalyaan had performed flawlessly in over two dozen earlier missions since 1992, and scientists were confident that this time too, things would go as per plan.

“The engine will be fired for nearly 4 seconds and almost half a kg of fuel will be needed for this operation," ISRO’s scientific secretary Koteshwar Rao is quoted by media as saying.

Now, that the Mangalyaan has passed the test, countdown has begun for the final phase. ISRO Chairman K Radhakrishnan said, ISRO now gears up for the D-day.

In 48 hours, on September 24, MOM’s eight thrusters will be fired to slow down Mangalyaan and it will be injected into a safe orbit around the Red Planet.

According to ISRO, if the spacecraft makes it, India will be the fourth after US, Russia and Europe to reach the Red planet.

Once in orbit, the craft’s five payloads will take pictures and collect data for the next six months.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.