August 09, 2026 08:28 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘A morning I will cherish’: Raghav Chadha meets PM Modi, shares photos from ‘enriching’ meeting | Delhi Mercedes crash kills 70-year-old woman: Cop’s son behind wheel, beer bottle found | Indian-origin woman accused of ‘visa fraud’ on X: US Attorney steps in with major clarification | US Senate passes Russia sanctions bill: India can face Trump’s 100% tariff threat | Expired meat, rotten vegetables found at Bengaluru's luxury hotels, legal action begins | 'I'm ready to be humiliated': Vijay, Udhayanidhi Stalin clash in Tamil Nadu Assembly over Cauvery dispute | 'They don't need Mohan Bhagwat's certificate': Priyanka Gandhi Vadra's sharp reply to RSS chief's Gen Z remark | 'Students, Gen Z, ask me anything': Rahul Gandhi launches Instagram Q&A, responds to Jharkhand protest | PM Modi goes Gen Z, urges Indians to share 'Get Ready With Me' videos on National Handloom Day | Former Tehelka editor Tarun Tejpal sentenced to 10-year jail term in 2013 rape case as Bombay HC overturns acquittal
ISRO
Image Cr: UNI

ISRO's gearing up for GSLV-F10/EOS-O3 mission on Aug 12

| @indiablooms | Aug 05, 2021, at 11:54 pm

Chennai/UNI: After a long gap, the Indian Space Research Organisation (ISRO) is gearing up for a GSLV mission from the spaceport of Sriharikota, about 100 km from here, on August 12 early morning.

ISRO sources said Thursday the Geosynchronous Satellite Launch Vehicle-F10 (GSLV-F10) will instigate Earth Observation Satellite, EOS-03 from the Second Launch Pad of Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota.

The launch is tentatively scheduled at 0543 hrs on August 12, subject to weather conditions.

EOS-03 is a state-of-the-art agile Earth observation satellite that will be placed in a Geosynchronous Transfer Orbit by GSLV-F10. Subsequently, the satellite will reach the final geostationary orbit using its onboard propulsion systems.

A four-metre diameter Ogive shaped payload fairing is being flown for the first time in this GSLV flight.

This is the fourteenth flight of GSLV and the first flight for ISRO this year after several of its launch missions were hit by the COVID pandemic.

The 2,268 kg EOS-3 or the Geo Imaging Satellite-1 (GISAT-1), will be the country's first sky eye or earth observation satellite to be placed in geostationary orbit.

The satellite will keep a steady eye on the areas of interest (the satellite will move in sync with the rotation of the earth and hence would look stationary) unlike other remote sensing satellites placed in a lower orbit that can come to a spot only at regular intervals.

Originally the GISAT-1 was slated for launch on March five last year but was postponed a couple of hours before the launch due to a technical glitch.

Soon after the Covid-19 pandemic and the subsequent lockdown delayed the mission. The rocket had to be dismantled and cleaned up.

Subsequently, the GISAT-1 launch was slated for March this year, but due to problems in the satellite's battery side, the flight got delayed. With the replacement of the battery, the satellite and the rocket were being readied for the mission when the second COVID wave led to further delay.

However, the ISRO sources exuded confidence that the mission will take off smoothly on August 12.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.