April 30, 2026 08:44 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Exit Polls Give Bengal to BJP—But One Survey Begs to Differ | Big defence push: Rajnath Singh to hold high-stakes talks with Italy’s Defence Minister | “Voting without fear”: PM Modi hails record turnout in West Bengal polls | Mamata Banerjee trying to intimidate Hindu voters, alleges Suvendu Adhikari in Bhabanipur | Operation Sindoor boost: India is now fifth-largest military spender at USD 92.1 billion in 2025, Pakistan's spending is also up | ‘Got the guts?’ Derek O’Brien dares Modi to quit if Mamata Banerjee wins Bengal polls | ECI ‘harassing’ TMC, dancing to BJP’s tune: Mamata Banerjee in Bhabanipur | ‘Nothing like playing football’: PM Modi unwinds in Sikkim after Bengal poll blitz | Crackdown on D-Company: Dawood aide Salim Dola deported to India | Mumbai horror: Man asks two security guards to recite ‘kalma’, then stabs them

India preparing for GSLV-D6: Singh

| | Jul 24, 2014, at 03:20 am
New Delhi, July 23 (IBNS) Union Minister of State (Independent Charge) for Ministry of Science and Technology, M/o Earth Sciences, D/o Atomic Energy and D/o Space Jitendra Singh on Wednesday said the GSLV project has successfully launched GSLV-D5 flight with indigenous Cryogenic engine and stage on Jan 5 from Satish Dhawan Space Centre, Sriharikota and is currently preparing for the next flight GSLV namely, GSLV-D6.
"The GSLV-F02, GSLV-D3 and GSLV-F06 flights could not accomplish the mission objectives. Subsequently, failure analysis committees were formed to (a) carry out in-depth analysis of the flight performance and identify causes for the failure, and (b) recommend corrective measures and future course of action on the GSLV Vehicle. The failure analysis committees have submitted their recommendations," Singh said in a reply to a written question in the Lok Saha on Wednesday.  
 
He said, "Based on the suggestions made by the failure analysis committees, ISRO has implemented the modifications and improvements in GSLV, which include independent inspection and quality checks for all critical components and sub-assemblies, change of bearing housing material, revision of tolerances and seal clearances of Fuel Booster Turbo Pump of Cryogenic Engine, redesign of the Cryogenic Stage Lower Shroud, revision of connector mounting scheme and wire tunnel configuration."
 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.