October 05, 2026 04:42 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'If law wasn't followed, we can undo it': Supreme Court's big warning on SIR process amid Gyanesh Kumar row | From TMC Rajya Sabha MP to BJP nominee in 6 months: Koel Mallick's stunning political U-turn | ‘Stomp on your head’: Omani flydubai co-pilot’s chilling posts on violence against women surface | Asian Games 2026: India beat Pakistan to clinch gold in men's cricket | flydubai cockpit attack: Deleted posts expose Omani co-pilot’s views on women, alleged extremist past | flydubai cockpit horror: Omani co-pilot Hamam al-Hammami attacked Captain Smit Machchhar with crash axe, tried to seize control | flydubai temporarily suspends all Israel flights after co-pilot’s alleged cockpit attack, crash attempt | Grounded in Oman over ‘radical views’, then hired by flydubai: What we know about Omani pilot Hamam al-Hammami | ‘Hanuman Chalisa gave me courage’: Smit Machchhar recounts flydubai cockpit battle to PM Modi | PM Modi speaks to Flydubai pilot Smit Machchhar who foiled crash plot, praises his courage
Indore Metro Rail
Image Credit: texmaco.in

Texmaco wins tender worth Rs 253 cr for Indore Metro’s Yellow Line

| @indiablooms | Oct 27, 2022, at 11:34 pm

Kolkata: Texmaco Rail and Engineering Ltd. has bagged a Rs 252.88 crore contract to supply standard gauge Ballast less Track for the Indore Metro Rail project.

The Madhya Pradesh Metro Rail Corporation Limited (MPMRCL) opened the financial bids for the contract package IN-08 where Texmaco appeared to be the lowest bidder beating the Rs 262.32 crores bid of Larsen & Turbo Ltd. (L&T).

The other bidders were Vijay Nirman Company Pvt. Ltd. and Rail Vikas Nigam Ltd. (RVNL), which could not qualify for the eligibility criteria and tender terms.

As per the tender, the work’s scope includes designing, supplying, installing, testing, and commissioning the Ballast less Track of Standard Gauge for the Indore Metro Yellow Line.

The tender notice for these works was issued in February this year with an approximate value of Rs 238 crores and a period of 1274 days (approximate 3.5 years) for completion.

The value of the project is Rs 252 crores where the root length is 32 km and track length 70 km, which includes complete supply of rails, fasteners, turnout & buffer stops. The line is supposed to be 33.53 km long making a ring line to connect Palasia - Railway Station - Rajwara-Airport - Bhawarsala -
MR10 - Palasia with 30 stations.

Proud to have gotten this opportunity, UV Kamath, Managing Director of Bright Power, EPC Division of Texmaco Rail & Engineering said, “It re-establishes Texmaco’s rich and successful experience in projects related to Metro Rail including laying of ballast less tracks and associated work. It is one more landmark in Texmaco’s achievement in this area.”

(With UNI inputs)

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.