May 10, 2026 07:32 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Big defence boost: India successfully tests advanced Agni MIRV missile | India, Singapore unite for tough action against terror and transnational crime | TVK crosses majority mark with VCK, IUML support | I bow before Bengal: PM Modi’s powerful gesture at Suvendu Adhikari’s oath goes viral | Bengal turns a new page: Suvendu Adhikari takes oath as CM amid massive NDA show of strength | Cloud over Tamil Nadu government formation as Governor asks Vijay to prove majority | 1 Year of Operation Sindoor: PM Modi says it showed India’s firm response to terror | ‘Larger conspiracy ahead of PM Modi’s visit’: BJP on killing of Suvendu Adhikari’s aide | ‘My car was on OLX for sale’: Siliguri owner says number plate used in Suvendu aide assassination may have been cloned online | ‘Pre-planned political assassination’: BJP’s Swapan Dasgupta on Suvendu aide’s killing

One million tonnes hot metal produced till date by modern Blast Furnace "Kalyani" of SAIL-ISP

| | Sep 17, 2015, at 01:07 am
Burnpur, Sept 16 (IBNS): Within a year of its start, the new Blast Furnace "Kalyani" at IISCO Steel Plant touched the magical figure of producing 1 (one) million tons of hot metal on Wednesday.

The country's largest Blast Furnace that was “blown in” on 30 November last year has a useful volume of 4160 cubic meters, and can produce about 8000 tons of hot metal per day. It has been built by POSCO (Engineering and Construction), South Korea and NCC Ltd, India.

"The proud moment was witnessed by ED(F&A) Sudhir Kumar, EDi/c(Proj & SGW Kulti) R N Das, ED(MM) Himadri Bhattacharya, ED(Works) Rajesh K Rathi, ED(Proj) Arun K Rath, GM(Blast Furnace) Pawan K Singh, GM(Proj) G Vishwanadham and senior officials," read a statement issued byu the organization.

With an enhanced campaign life of 20 years, it is equipped with systems such as pulverized coal injection, cast house fume extraction, cast house slag granulation, high top pressure operation coupled with top pressure recovery turbine, twin material bin bell-less top, waste heat recovery and conveyor belt charging system.

It incorporates level II automation and has twin flat cast house with four tap holes.

The environment-friendly furnace ensures minimum emissions and recovers waste energy to the fullest; it also has a closed-loop cooling system resulting in almost zero water discharge.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm