May 12, 2026 03:04 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Suvendu Adhikari Cabinet clears BSF land transfer, census rollout, Ayushman Bharat in Bengal | Mamata govt's welfare schemes to continue: Bengal CM Suvendu Adhikari after first cabinet meeting | ‘One of life’s most emotional moments’: PM Modi performs grand Mahapuja at Somnath Temple | UPI trail cracks Suvendu Adhikari aide Chandranath Rath murder case; three arrested | Totally unacceptable: Trump rejects Iran’s peace plan in explosive showdown | Big defence boost: India successfully tests advanced Agni MIRV missile | India, Singapore unite for tough action against terror and transnational crime | TVK crosses majority mark with VCK, IUML support | I bow before Bengal: PM Modi’s powerful gesture at Suvendu Adhikari’s oath goes viral | Bengal turns a new page: Suvendu Adhikari takes oath as CM amid massive NDA show of strength

L&T's Power Business wins orders from DVC

| @indiablooms | Jul 19, 2019, at 04:59 pm

Mumbai , Jul 19 (UNI) Engineering Major, Larsen & Toubro (L&T) on Friday said its Power business has bagged significant engineering, procurement and construction (EPC) orders from Damodar Valley Corporation (DVC)

The order is to set up Flue Gas Desulphurisation (FGD) systems in three power plants of DVC - Durgapur Steel Thermal Power Station (2x500 MW), Mejia Thermal Power Station (2x500 MW) and Raghunathpur Thermal Power Station (2x600 MW) - in West Bengal. Company said in a filing with BSE.

This is in continuation to the orders L&T had received earlier from NTPC for setting up FGD systems.

Installation of FGD systems in existing and upcoming thermal power plants has been made mandatory by Ministry of Environment, Forest and Climate Change (MoEFCC), Government of India, to curtail SO2 emissions.

Commenting on the FGD orders, Mr Shailendra Roy, CEO & Managing Director, L&T Power and Whole-Time Director, L&T, said, "We are delighted to have secured orders from a prestigious client like DVC. L&T is fully equipped to provide solutions for SOx and NOx control to its clients. Considering the deadline endorsed by the apex court, other power plants will have to hasten the process of FGD award to meet the scheduled time frame. L&T will continue to play a significant role in this market of SOx and NOx reduction."

Ministry of Power, Government of India, has set December 2022 as the deadline for existing thermal power plants to comply with revised emission norms. 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm