July 05, 2026 03:37 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'Why can't citizens protest against the government? They are being made slaves by slapping cases': Bombay HC slams Mumbai Police, quashes activist's externment | 'First he cheats on me...': Siya Goyal's old pub video goes viral amid probe into fiancé Ketan Agarwal's alleged murder | Ronaldo's goal, Ramos' last-gasp winner send Portugal past Croatia, set up Spain clash | India-US trade deal almost done! Piyush Goyal hints at breakthrough | Ram Mandir donation scam: Champat Rai points finger at his own driver | PM Modi welcomes Japanese PM Sanae Takaichi as India-Japan ties enter a new era | 'Not an isolated incident': India slams Pakistan after 125-year-old historic Gurdwara is demolished | Ram Mandir donation theft: Six accused were employed by Varanasi-based security firm, probe reveals | Ayodhya Ram Temple donation theft: Probe says majority of money was allegedly stolen during Kumbh Mela | Commercial LPG price slashed by Rs 183.50 from July 1; check new rates in Delhi, Mumbai, Kolkata and Chennai
UNI

BHEL clinches order for 40 MW Rahughat Hydroelectric Project in Nepal

| @indiablooms | Feb 03, 2020, at 05:35 pm

Mumbai/UNI:  BHEL has won an order for the ElectroMechanical (EM) works for the 40 MW Rahughat Hydroelectric Project in Nepal.

The order has been placed on BHEL by the Raghuganga Hydropower Limited (RGHPL), a company 100 per cent owned by Nepal Electricity Authority (NEA) the sole public power utility in Nepal and owned by the Nepal government.

The project is majority funded by EXIM Bank of India in the form of a soft loan, along with funding from NEA and the Nepal government. WAPCOS, India is the project consultant, BHEL said in a filing with BSE.

The order for Rahughat HER, located in the Raghuganga municipality of Myagdi district of Nepal, envisages design, engineering, manufacturing, supply, erection and commissioning of the complete electro-mechanical package involving supply of two Vertical Pelton Turbines (20 MW each) along with associated equipment, matching generators, governors, controls & instrumentation, protection system, transformers, 220 KV switchyard and balance of plant (BoP) packages.

Major equipment for the contract will be manufactured and supplied by BHEL's plants at Bhopal, Jhansi, Rudrapur and Bengaluru, while the installation activities onsite will be carried out by the company's Power Sector - Northern Region division, Noida.

This is the second consecutive success for BHEL in the hydro power sector of Nepal. Last year, BHEL had won a prestigious order for the largest Hydropower project in Nepal - 900 MW Arun-3 HEP, which is presently under construction.  

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm