April 16, 2026 06:49 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bengal SIR: Supreme Court allows voters restored by tribunal till April 21 and 27 to vote | 'Women won't spare you': PM Modi warns Opposition over resistance to quota bill | Vijay booked in 3 cases over poll code violation ahead of Tamil Nadu polls | 'Black law': Stalin burns copy of 'delimitation' bill, slams Modi govt | TCS halts Nashik BPO operations amid sexual abuse, conversion allegations | ‘We are surprised’: SC stays Pawan Khera’s bail over remarks on Himanta Biswa Sarma’s wife | Historic shift: Bihar gets first BJP CM as Samrat Choudhary takes oath | 'ECI deviated from Bihar procedure': Supreme Court raises concerns over voter deletion in Bengal SIR | Noida workers’ protest turns violent: Stones pelted, vehicles damaged over wage hike demand | Oil prices jump above $103 a barrel as US moves to block Iran-linked shipping
Zojila Pass
Image credit: UNI

Zojila Pass kept open by BRO for first time in January: Army

| @indiablooms | Jan 06, 2022, at 01:27 am

Srinagar/UNI: Zojila Pass that connects Kashmir with Ladakh was kept open by Border Road Organization (BRO) for the first time in January, the Indian Army said on Wednesday.

Srinagar based defence spokesman Col Emron Musavi said that in spite of heavy snowfall at Zojila, BRO Karmyogis, with relentless effort under 'Project Beacon', ensured that the pass remained functional facilitating connectivity to the Ladakh region.

Zojila -the land route from Kashmir to Ladakh- is the toughest Pass in the country due to its harsh weather conditions, treacherous and accident-prone mountain range.

Located at an altitude of 11,643 feet on Srinagar-Sonamarg-Gumri road, Zojiala is the lifeline between Kashmir Valley and Ladakh.

“Last year Zojila Pass was kept open till 31 December 2020, however this year due to concerted efforts of Project Beacon, the Zojila Pass was opened for the first time ever in the month of January,” the spokesman said.

He said Zojila Pass has its own unique challenges of freezing temperatures and lack of oxygen and frequent avalanches.

“Due to unrelenting efforts, BRO personnel have ensured trafficability on Srinagar – Sonamarg – Gumri Road across Zojila Pass by employing more than 20 heavy duty equipment including four state of the art Snow Cutters,” he said.

Project Beacon has ensured connectivity for strategic requirements of Defence forces and also the local population.

The snowfall in the last two- three days has resulted in slippery road conditions along Zojila Pass on Srinagar – Leh highway causing disruption to traffic movement.

“Detachments of Project Beacon with pre positioned equipments located at Gumri, Bajri Nallah, Baltal, Sonamarg and Gagangir played key role to in opening of the Pass despite the inclement weather conditions. Day and night loose their relevance when six teams deployed at different locations worked 24x7 to keep the road open during extremely challenging conditions,” he said.

“BRO Karamyogis ensured safe passage of 175 vehicles to cross over the pass since January 1. The efforts of BRO was lauded by the Civil administration as well as the local population,” the spokesperson added.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.